# Construction work for power plant – ”Construirea unui bloc energetic de cca. 850MW pe gaz natural la Ișalnița ("CCGT Ișalnița")” – proiectare, achizitie, execuție lucrări, punere in functiune si servicii de mentenanta pe termen lung

[Societatea CCGT POWER Isalnita SA](https://tendernation.io/buyers/societatea-ccgt-power-isalnita-sa)

Estimated value

RON 3,769,926,000

Published

4 Nov 2025

Deadline

Closed

30 Dec 2025

## Who can bid

- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

## About this tender

Obiectul contractului il reprezinta proiectarea si execuția lucrarilor de construire a unui bloc energetic pe gaz natural ce include un ciclu combinat cu turbină pe gaze-abur (CCGT) pentru producerea energiei electrice cu capacitatea de cca. 850 MW, inclusiv punerea în funcțiune și asigurarea serviciiilor de mentenanță pe termen lung (LTSA) pentru echipamentele principale (turbină pe gaz, turbină pe aburi și generatoare, inclusiv sistemele lor auxiliare). Durata contractului este de 198 luni și se compune din: 6 luni durata estimata pentru proiectarea lucrarilor, 36 luni durata estimata pentru executie lucrări și 156 luni pentru servicii de mentenanță pentru echipamentele principale. Perioada de garanție (PND) este de 36 de luni de la semnarea procesului verbal de recepție la terminarea lucrărilor. NOTE: In conformitate cu prevederile art.172, alin. (1) din Legea nr.99/2016, orice operator economic interesat are dreptul de a solicita clarificări sau informaţii suplimentare în legătură cu documentaţia de atribuire, cu respectarea termenului-limită stabilit de entitatea contractantă. Entitatea Contractanta (EC) stabileste 2 termene pana la care va raspunde in mod clar si complet tuturor solicitărilor de clarificări, astfel: - primul termen: in a 27-a zi inainte de data limita de depunere a ofertelor EC va raspunde solicitarilor care au fost transmise pana in a 41-a zi inainte de data limita de depunere a ofertelor; - al doilea termen/ultimul termen: in a 11-a zi inainte de data limita de depunere a ofertelor EC va raspunde solicitarilor care au fost transmise pana in a 25-a zi inainte de data limita de depunere a ofertelor. In conformitate cu prevederile art.29, alin. (3) din HG nr.394/2016, entitatea contractanta va raspunde doar la solicitarile de clarificari adresate de operatorii economici pana la termenul-limita stabilit. Entitatea Contractantă nu are obligația de a răspunde la alte solicitări transmise după publicarea răspunsurilor de la doilea termen (ultimul termen), în cazul in care se prelungeste data limita de depunere a ofertelor. In situatia in care una sau mai multe din datele stabilite sunt in zi nelucratoare, se va lua in considerare ziua lucratoare imediat urmatoare acelei/acelor date, cu conditia respectarii termenului minim de 10 zile inainte de data limita pentru depunerea ofertelor. Daca nu se poate respecta termenul minim de 10 zile precizat atunci raspunsul va fi publicat in ziua anterioara acelei/acelor date.

Read full description

## CPV classification

Construction work for power plant Site preparation work Miscellaneous special-trade construction work Repair and maintenance services of electrical machinery, apparatus and associated equipment Engineering design services Technical assistance services

Source

Tenders Electronic Daily (EU) · Notice 729623-2025

[View official notice](https://ted.europa.eu/en/notice/729623-2025)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile Societatea CCGT POWER Isalnita SA: past awards and live tenders](https://tendernation.io/buyers/societatea-ccgt-power-isalnita-sa) [Sector More Construction work tenders](https://tendernation.io/sectors/construction-work)

## More tenders like this

[Bannister Sports Centre Athletic Track Soft Market Testing Exercise · Harrow Council · 38 days left · 26 Nov 2026](https://tendernation.io/opportunities/01a1540d-d9e4-71cb-ad57-1603e9042fec/bannister-sports-centre-athletic-track-soft-market-testing-exercise) [Hdc-1714 wadkins pavilion refurbishment · Harborough District Council · 39 days left · 27 Nov 2026](https://tendernation.io/opportunities/01a155bf-f664-72f9-9823-a85d6cddbdc6/hdc-1714-wadkins-pavilion-refurbishment) [Design, supply, and Installation of Newbiggin Skatepark Extension · Newbiggin Town Council · 35 days left · 23 Nov 2026](https://tendernation.io/opportunities/01a15552-19a2-7348-a5cc-3f5ae51ef934/design-supply-and-installation-of-newbiggin-skatepark-extension) [Tender for the design, supply, delivery and installation of a modular UNIT and associated works at ARC healthy living, irvinestown. peaceplus funded upgrade works · Fermanagh and Omagh District Council · 14 days left · 2 Nov 2026](https://tendernation.io/opportunities/01a15552-1b74-73ec-a6f6-a1af37959997/tender-for-the-design-supply-delivery-and-installation-of-a-modular-unit-and-a) [ESPH AB RDC Sidley Depot (ESPH753) · Rother District Council · 49 days left · 7 Dec 2026](https://tendernation.io/opportunities/01a15552-1d19-7155-8fe0-0d917105fca8/esph-ab-rdc-sidley-depot-esph753) [Demolition, Design and Construction of Howard's Lane Public Toilets, Howard's Lane, Wareham · Wareham Town Council · 88 days left · 15 Jan 2027](https://tendernation.io/opportunities/01a15552-1d8a-7277-bc5b-edc9a127ee5b/demolition-design-and-construction-of-howards-lane-public-toilets-howards-la)