Source: https://tendernation.io/opportunities/01a14064-c391-7378-8a27-823ee9f2a6f8/netherlands-building-installation-work-framework-agreement-for-the-solar-par

Open for bids NL restricted procedure

# Building installation work – Framework Agreement for the Solar Park - Energielandschap Lageland

[Zonnepark Meerstad Noord B.V.](https://tendernation.io/buyers/zonnepark-meerstad-noord-bv)

Estimated value

Not stated

Published

28 Sept 2026

Deadline

11 days left

29 Oct 2026

## Who can bid

- Sets up a framework

    Winning a place does not guarantee work: contracts are awarded later as call-offs, and the list usually stays closed for years.

## About this tender

The Client intends to enter into a Framework Agreement (the Agreement) with three (3) parties for the construction of the Solar Park. The Specific Contracts under the Agreement will be put out to tender as turnkey EPC contracts for the Solar Park, with the Tenderer who, in the ranking of this tender, has submitted the most economically advantageous tender being awarded the first Specific Contract. The EPC contractor must deliver the solar park on a turnkey basis, including the intake substation. The EPC contractor is responsible for the necessary coordination with the supplier of the intake substation and for ensuring the correct integration of both installations. Phase 1: approximately 58.9 MWp PV, connected to a 21 MW grid connection (shared with the BESS), with a target operational date of Q1 Phase 2: expansion by approximately 142.3 MWp of PV (total approximately 201 MWp; including third-party contributions, approximately 250.5 MWp), in conjunction with the upscaling of t 2029. - Phase 1: approximately 58.9 MWp PV, connected to a 21 MW grid connection (shared with the BESS), with a target operational date of Q1 2029. - Phase 2: expansion by approximately 142.3 MWp of PV (total approximately 201 MWp; including third-party contributions, approximately 250.5 MWp), in conjunction with the upscaling of the connection (feed-in capacity up to 260 MW, off-take up to 145 MW). Phase 2 is not being awarded at this stage, but is secured within the Agreement and will be called off at a later date via a mini-competition between the Framework Contractors. The indicative timetable is around 2032/2033, subject to TenneT. The site covers approximately 175 ha of wet peatland.

Read full description

## CPV classification

Building installation work Solar energy

Source

Tenders Electronic Daily (EU) · Notice 664710-2026

[View official notice](https://ted.europa.eu/en/notice/664710-2026)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile Zonnepark Meerstad Noord B.V.: past awards and live tenders](https://tendernation.io/buyers/zonnepark-meerstad-noord-bv) [Sector More Construction work tenders](https://tendernation.io/sectors/construction-work)

## More tenders like this

[Electrical installation work – Framework Agreement Battery Energy Storage Systems - Energielandschap Lageland · Batterij Meerstad Noord B.V. · 11 days left · 29 Oct 2026](https://tendernation.io/opportunities/01a14064-ac7c-70ec-a8b1-d3e483e1edd9/netherlands-electrical-installation-work-framework-agreement-battery-energy) [Solar panels – Zonnepanelen en Energieopslag · Veiligheidsregio Rotterdam-Rijnmond · 44 days left · 2 Dec 2026](https://tendernation.io/opportunities/01a14061-e9b4-7366-951c-01435e465da4/netherlands-solar-panels-zonnepanelen-en-energieopslag) [Construction work – North Sea I, South, Offshore Wind Farm · Danish Energy Agency · 735 days left · 23 Oct 2028](https://tendernation.io/opportunities/01a140a5-f3f8-70b8-b2ed-9bea60b91e7f/denmark-construction-work-north-sea-i-south-offshore-wind-farm) [Construction work for power plant – Wykonanie robót budowlanych w formule zaprojektuj i wybuduj: Projektowanie, dostawa i budowa :instalacji fotowoltaicznej pn. PV Skalin 1 o mocy zainstalowanej do 5,61MW;instalacji fotowoltaicznej pn.PV Gryfice 2 o mocy zainstalowanej do 9MW; Projektowanie, dostawa i budowa Magazynu Energii Elektrycznej pn.ME Skalin 1 o mocy zainstalowanej 4,472MW; ME Gryfice 2 o mocy zainstalowanej8,944MW · ENEA Nowa Energia sp. z o.o. · 4 days left · 23 Oct 2026](https://tendernation.io/opportunities/01a14210-8013-7234-b1fd-46f721492b39/poland-construction-work-for-power-plant-wykonanie-robot-budowlanych-w-formu) [Construction work for power plant – Wykonanie robót budowlanych w formule zaprojektuj i wybuduj: Projektowanie, dostawa i budowa :instalacji fotowoltaicznej pn. PV Skalin 1 o mocy zainstalowanej do 5,61MW;instalacji fotowoltaicznej pn.PV Gryfice 2 o mocy zainstalowanej do 9MW; Projektowanie, dostawa i budowa Magazynu Energii Elektrycznej pn.ME Skalin 1 o mocy zainstalowanej 4,472MW; ME Gryfice 2 o mocy zainstalowanej8,944MW · ENEA Nowa Energia sp. z o.o. · 2 days left · 21 Oct 2026](https://tendernation.io/opportunities/01a14061-fa56-72c2-a410-28a6d8e90855/poland-construction-work-for-power-plant-wykonanie-robot-budowlanych-w-formu) [Building installation work – MP-110078 N13 RG Centro manutenzione S. Bernardino, Messa a nuovo degli edifici esistenti e ampliamento / Parte II - Impianto fotovoltaico sui tetti · Ufficio federale delle strade USTRA, Divisione infrastruttura stradale Est · 45 days left · 3 Dec 2026](https://tendernation.io/opportunities/01a1405e-bc00-72b8-85ae-f4524f28eb5f/switzerland-building-installation-work-mp-110078-n13-rg-centro-manutenzione)
