# Electrical installation work – Framework Agreement Battery Energy Storage Systems - Energielandschap Lageland

[Batterij Meerstad Noord B.V.](https://tendernation.io/buyers/batterij-meerstad-noord-bv)

Estimated value

Not stated

Published

28 Sept 2026

Deadline

11 days left

29 Oct 2026

## Who can bid

- Sets up a framework

    Winning a place does not guarantee work: contracts are awarded later as call-offs, and the list usually stays closed for years.

## About this tender

The Client intends to enter into a framework agreement (the Agreement) with three contractors for the realisation of the Battery Energy Storage System (BESS) at Energielandschap Lageland. The specific contracts under the Agreement will be put out to tender as turnkey EPC contracts for the Energielandschap Lageland battery park. The Client is procuring a functional end product: a ready-to-use, grid-compliant and safe battery system that meets the performance requirements set out in the tender specifications. The EPC contractor is responsible for the design, supply, construction, system integration, testing, commissioning and handover of a ready-to-use battery system, as well as (via a separate O&M agreement) for its long-term operation and maintenance. - Phase 1: approximately 15 MW // 60 MWh BESS, connected to a 21 MW grid connection, with commissioning planned for Q1 2029. - Phase 2: expansion to at least 50 MW // 200 MWh BESS, in conjunction with the upscaling of the connection (feed-in up to 260 MW, off-take up to 145 MW). Phase 2 is not being awarded at this stage, but is secured within the framework agreement and will be called off later via a mini-competition between the framework contractors. The indicative timetable is around 2032/2033, subject to TenneT’s approval.

## CPV classification

Electrical installation work Batteries Building installation work

Source

Tenders Electronic Daily (EU) · Notice 664120-2026

[View official notice](https://ted.europa.eu/en/notice/664120-2026)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile Batterij Meerstad Noord B.V.: past awards and live tenders](https://tendernation.io/buyers/batterij-meerstad-noord-bv) [Sector More Construction work tenders](https://tendernation.io/sectors/construction-work)

## More tenders like this

[Building installation work – Framework Agreement for the Solar Park - Energielandschap Lageland · Zonnepark Meerstad Noord B.V. · 11 days left · 29 Oct 2026](https://tendernation.io/opportunities/01a14064-c391-7378-8a27-823ee9f2a6f8/netherlands-building-installation-work-framework-agreement-for-the-solar-par) [Accumulators, primary cells and primary batteries – BESS met lokaal Edge EMS ten behoeve van netcongestie · Waterschap Rijn en IJssel · 51 days left · 9 Dec 2026](https://tendernation.io/opportunities/01a14061-c9a0-7384-84d2-445c82d270ab/netherlands-accumulators-primary-cells-and-primary-batteries-bess-met-lokaa) [Construction work – AO pour la construction et l'O&M des BESS de Petit Buisson · EDF Renouvelables SA · 44 days left · 1 Dec 2026](https://tendernation.io/opportunities/01a140ab-2ba8-7205-a65e-7d30ade860b1/france-construction-work-ao-pour-la-construction-et-lom-des-bess-de-petit) [Construction work – AO pour la construction et l'O&M des BESS de Baixas · EDF Renouvelables SA · 44 days left · 1 Dec 2026](https://tendernation.io/opportunities/01a140ab-1670-73a1-8e57-695ae0e370a4/france-construction-work-ao-pour-la-construction-et-lom-des-bess-de-baixas) [Batteries – BESS-Systen (Batteriespeicher) · Fachhochschule Aachen · 30 days left · 18 Nov 2026](https://tendernation.io/opportunities/01a1405e-5928-715e-82a6-e2e974568131/germany-batteries-bess-systen-batteriespeicher) [Public utilities – BME EEA 2026-15 Framework agreement for the operation of municipal electric vehicle chargers in Bergen · Bergen Municipality · 14 days left · 2 Nov 2026](https://tendernation.io/opportunities/01a14063-da65-72ac-abb4-9b1f97a5aaaa/norway-public-utilities-bme-eea-2026-15-framework-agreement-for-the-operatio)