Source: https://tendernation.io/opportunities/01a13e12-b38d-721f-89f1-9b9d168e4e34/modernisation-of-lift-installations-at-oliphant-court-paisley-renfrewshire

awarded GB open procedure

# Modernisation of Lift Installations at Oliphant Court, Paisley, Renfrewshire

[Paisley Housing Association](https://tendernation.io/buyers/paisley-housing-association)

Estimated value

Not stated

Published

6 Nov 2024

Deadline

Rolling deadline

## Who can bid

- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

## About this tender

The existing installation consists of two independent 10 person, 750kg traction passenger lifts,

each serving eight floors and with a single entrance having power operated single panel car

and landing doors.

The proposed works comprise the modernisation of the lift engineering installations with the

manufacture, site erection, commissioning, certifying and maintenance for 1 year following

practical completion of the replacement of the lift control panels and control system cables, the

replacement of the main drive sheaves, the replacement of the suspension ropes and the

replacement of the car doors & door operators, landing entrances and architraves together with

modifications to the lift cabins and slings to accommodate the works.

Inclusion shall be made for the replacement of all control wiring including trailing flexes and the

Contractor shall liaise with the control system manufacturer to establish the precise

requirements for same to ensure compatibility between new and any retained components. The

Contractor shall make all allowances to interface new and any retained electrical equipment

with new galvanised trunking and conduits.

The existing hoisting machines, lift cabins, counterweights and guide rails shall be retained to

work in conjunction with the modernised installation. Where any incompatibility or inadequacy

is established, inclusion shall be made for any necessary modification or replacement of

components, wiring or software and/or additional components, additional wiring or additional

software to ensure that all other aspects of the proposed works can be accommodated and will

function as required by this Specification.

Inclusion shall also be made for all necessary attendant trades’ works associated with the

installation of lift equipment and the Contractor shall be responsible for the appropriate coordination

and site management of any sub-contractors engaged in this respect.

Inclusion shall also be made for all necessary lifting equipment, storage, temporary electrical

supplies, protection, cutting of ways, builderswork, making good, fixtures, all plant and materials

specified or otherwise to form a complete and working installation.

The works shall be undertaken during the continued occupation of the building and the

Contractor shall be responsible for the safeguarding of landings and lift entrances during the

works.

Read full description

## CPV classification

Lift installation work Lifts Lifts, skip hoists, hoists, escalators and moving walkways Parts of lifts Lift and escalator installation work Lift-maintenance services

Source

Public Contracts Scotland · Notice rls-242-NOV517700

[View official notice](https://www.publiccontractsscotland.gov.uk/search/show/search_view.aspx?ID=NOV517700)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile Paisley Housing Association: past awards and live tenders](https://tendernation.io/buyers/paisley-housing-association) [Sector More Construction work tenders](https://tendernation.io/sectors/construction-work)

## More tenders like this

[Bannister Sports Centre Athletic Track Soft Market Testing Exercise · Harrow Council · 38 days left · 26 Nov 2026](https://tendernation.io/opportunities/01a1540d-d9e4-71cb-ad57-1603e9042fec/bannister-sports-centre-athletic-track-soft-market-testing-exercise) [Construction work – (WZNOWIONE POSTĘPOWANIE) Budowa i przebudowa kogeneracji gazowych o łącznej mocy 4,636 MWe i 5,729 MWt w Elektrociepłowni Ciechanów · Elektrociepłownia Ciechanów sp. z o.o. · 7 days left · 26 Oct 2026](https://tendernation.io/opportunities/01a156a9-8e72-7024-a07c-4da735079800/poland-construction-work-wznowione-postepowanie-budowa-i-przebudowa-kogene) [Demolition work – Rück- und Neubau Lichthochmaste · Hamburg Verkehrsanlagen GmbH · 7 days left · 26 Oct 2026](https://tendernation.io/opportunities/01a156a9-6ef0-7276-94e2-d5fa0cb2d6c7/germany-demolition-work-ruck-und-neubau-lichthochmaste) [Heating plant construction work – Petrašiūnų elektrinės elektrifikacija, įrengiant elektros energijos kaupimo įrenginius, dyzelinį generatorių ir rekonstruojant 6 kV skirstyklą (projektavimas ir rangos darbai) · Akcinė bendrovė „Kauno energija“ (PV) · 7 days left · 26 Oct 2026](https://tendernation.io/opportunities/01a156a9-6f1d-727f-a077-bc25dec93b92/lithuania-heating-plant-construction-work-petrasiunu-elektrines-elektrifikac) [Floor-covering work – Universität Leipzig, Leuschnerplatz, Global Hub, Forschungsneubau · Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Zentrale, Zentralstelle Vergabe- und Vertragsmanagement · 2 days left · 22 Oct 2026](https://tendernation.io/opportunities/01a156a9-acfc-73ee-baab-9e699f88521a/germany-floor-covering-work-universitat-leipzig-leuschnerplatz-global-hub) [Building construction work – Budowa budynku mieszkalnego wielorodzinnego wraz z infrastrukturą techniczną w miejscowości Szczucin · KZN SIM Tarnów Sp. z o.o. · 7 days left · 26 Oct 2026](https://tendernation.io/opportunities/01a156a9-d859-7328-9ee6-a304ce645326/poland-building-construction-work-budowa-budynku-mieszkalnego-wielorodzinneg)
