# Brewery Turnback - ES6-8 Permanent Way

[Kier Infrastructure and Overseas - CP7 NWC](https://tendernation.io/buyers/kier-infrastructure-and-overseas-cp7-nwc)

Estimated value

£1,000,000 to £2,500,000

Published

7 Oct 2025

Deadline

Closed

13 Oct 2025

## Who can bid

- Buyer says suitable for SMEs

    The buyer ticked “suitable for SMEs” on the notice. Anyone can still bid.
- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

[More contracts for small businesses and VCSEs](https://tendernation.io/opportunities/for-small-businesses)

## About this tender

Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction.

At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation.

The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station.

As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround.

The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation.

ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available.

Permanent Way Scope of Work:

The supply, installation, testing and commissioning of the new turnback facility to accommodate trains:

- provision for a 6-car and buffer stop siding facility
- passive provision for an 8-car and buffer stop turnback facility
- track drainage

This includes all hand back deliverables, such as redline drawings, O&M manuals, and attendance at AMP016 walkouts.

Read full description

## CPV classification

Track construction works

Source

Contracts Finder (UK)

[View official notice](https://www.contractsfinder.service.gov.uk/notice/4238e22d-edc6-4ca4-b972-9caa25019f98)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile Kier Infrastructure and Overseas - CP7 NWC: past awards and live tenders](https://tendernation.io/buyers/kier-infrastructure-and-overseas-cp7-nwc) [Sector More Construction work tenders](https://tendernation.io/sectors/construction-work)

## More tenders like this

[Bannister Sports Centre Athletic Track Soft Market Testing Exercise · Harrow Council · 38 days left · 26 Nov 2026](https://tendernation.io/opportunities/01a1540d-d9e4-71cb-ad57-1603e9042fec/bannister-sports-centre-athletic-track-soft-market-testing-exercise) [Norwich City Verges Mowing 2026 · Norse Eastern Ltd · 30 days left · 18 Nov 2026](https://tendernation.io/opportunities/01a15476-5fd9-70eb-b920-a66dc3e661e1/norwich-city-verges-mowing-2026) [Gwasanaethau Toeau - Gwaith cyfalaf wedi'i gynllunio ac atgyweiriadau ymatebol / Roofing Services - Planned capital works and responsive repairs · Denbighshire County Council · 28 days left · 16 Nov 2026](https://tendernation.io/opportunities/01a15476-6094-72b9-928b-5c887e7ceea4/gwasanaethau-toeau-gwaith-cyfalaf-wedii-gynllunio-ac-atgyweiriadau-ymatebol) [Repair of St Michaels and All Angels Church Wall · Aylsham Town Council · 31 days left · 19 Nov 2026](https://tendernation.io/opportunities/01a15476-6316-7235-8948-8f108b3da399/repair-of-st-michaels-and-all-angels-church-wall) [Building Minor Works · Derbyshire Support and Facilities Services Limited · 26 days left · 13 Nov 2026](https://tendernation.io/opportunities/01a15408-9087-7003-bd47-df7bc19d7ff7/building-minor-works) [DGT Helipad Design and Construction · Dartford and Gravesham NHS Trust · 28 days left · 16 Nov 2026](https://tendernation.io/opportunities/01a15408-969e-7140-a307-fe72fa7128be/dgt-helipad-design-and-construction)