Source: https://tendernation.io/opportunities/01a13ce8-6366-707e-8c15-e53e752d4957/nutrient-neutrality-full-feasibility-assessment-of-the-potential-for-the-develo

awarded GB open procedure Suitable for SMEs

# Nutrient Neutrality -Full Feasibility Assessment of the Potential for the Development of Constructed Wetlands within Norfolk

[Natural England](https://tendernation.io/buyers/natural-england)

Estimated value

£15,000 to £48,000

Published

2 Oct 2023

Deadline

Closed

20 Oct 2023

## Who can bid

- Buyer says suitable for SMEs

    The buyer ticked “suitable for SMEs” on the notice. Anyone can still bid.
- Small contract value

    Valued under £135,018 including VAT, the lowest Procurement Act threshold for goods and services.
- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

[More contracts for small businesses and VCSEs](https://tendernation.io/opportunities/for-small-businesses)

## About this tender

Further feasibility work should provide the following information in report form. The work should be informed by the initial pre-feasibility report, 'Pre-Feasibility Assessment of the Potential for the Development of Constructed Wetlands' dated 03/05/2023. The report should provide the confidence to proceed to 'design and build' phases or the rationale for not proceeding with wetland implementation.

### Full feasibility Specification

The key deliverable for this contract will be:

- Build on the 'pre-feasibility reduction figures' through identification of the possible range, ie minimum and maximum, for nutrient reduction capacity of the site, via wetland creation, for Nitrogen and Phosphorus using:
- Transfer abstraction of water from the relevant watercourse and;

with generated reductions calculated using:

- One of the following methods with a supporting narrative
- P-k-C\* model
- k-C\* model
- regression equation

ii. Details of potential Flow

- Flows of water from the relevant source
- Inflow of other water sources
- Variability of flow with time

iii. Details of Concentration within Flow

- Nitrogen and Phosphorus loads within all water sources considered
- Variability of the quality with time

iv. Refinement should enhance reduction calculations by ensuring the most relevant/localised data is used. Including:

- A water balance calculation
- Estimated sediment accumulation rates
- Clarification of design objectives in terms of the site's capacity to generate nutrient reductions for N and P in the context of:
- Define the potential biodiversity impacts of:

o potential loss of ditch/stream (where relevant)

o water impoundment/abstraction

o water temperature impacts through wetland transfer

- Carry out soil substrate investigations to determine:

o potential for groundwater interaction

o the extent of clay onsite

o whether the wetland requires a clay or artificial liner

o if soil nutrient levels pose a risk of 'treatment liability' in terms of nutrient leaching

- Development of a monitoring and baselining strategy, including:

o identification of suitable monitoring points at in-flow and potential out-flows

o flow and nutrient concentration monitoring

- Ranged cost estimates of:

o implementation and construction

o performance monitoring to equilibrium

o annual wetland maintenance

- Carry out a desk-based assessment to identify any risks that may impact design or construction of the wetland from:

o archaeological areas on-site

o utilities on-site

- Define the potential impacts of 'urban runoff' on wetland effectiveness (where relevant) including but not limited to:

o contaminate collection and discharge risk

o contaminate effect on biological processes on wetland plants

### DESCRIPTION CONTINUES IN ADDITIONAL TEXT SECTION

Additional information: 3. Feasibility Assessment including constraints and options assessment covering:

- Topography
- On-site Soil & Water sampling and analysis
- Geology & Hydrogeology
- Groundwater protection,
- Hydrology & drainage
- Flood risk
- Protected sites & species
- Land use, Historic landfill & Contaminated Land
- Estimated costs of potential wetland design, construction, monitoring and maintenance

The above should be influenced by the provided 'site pre-feasibility' report and be undertaken within scope of the 'Wetland Mitigation Framework'

### Purpose of this Contract

To support the Nutrient Neutrality project's habitat delivery enabling Natural England, landowners and other interested parties to understand constraints and likely costs of progression towards the design and build phase of schemes.

\-----

To apply for this opportunity you must submit your quotation meeting the requirements detailed in the Request for Quotation (RFQ) attached.

Your response must be sent to  by 17:00 on 20th October 2023

If you have any clarification questions linked to this opportunity or the procurement process please submit these via email to . Please note that, unless commercially sensitive, both the question and the response will be circulated to all tenderers.

Read full description

## CPV classification

Environmental services

Source

Contracts Finder (UK)

[View official notice](https://www.contractsfinder.service.gov.uk/notice/872bd3be-890e-41b7-a739-39dfc0801f4f)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile Natural England: past awards and live tenders](https://tendernation.io/buyers/natural-england) [Sector More Sewage, refuse, cleaning & environmental tenders](https://tendernation.io/sectors/sewage-refuse-cleaning-environmental)

## More tenders like this

[Non-hazardous refuse and waste treatment and disposal services – (135/2026) Procedura aperta, ai sensi dell'0art. 71 del D.Lgs. n. 36/2023, con aggiudicazione secondo il criterio del minor prezzo , ai sensi dell'art. 108, comma 3 del D.lgs. n. 36/2023, per la scelta del contraente cui affidare il servizio, di ritiro vuoto per pieno, trasporto e avvio a recupero dei rifiuti misti dell'attività di costruzione e demolizione classificati codice E.E.R. 17.09.04, div · Gare Amiu Genova · 10 days left · 29 Oct 2026](https://tendernation.io/opportunities/01a156aa-01ac-732f-a0a5-ba900c7ea4b4/italy-non-hazardous-refuse-and-waste-treatment-and-disposal-services-13520) [Building-cleaning services – Neteja i desinfecció d'edificis i equipaments municipals. · Ajuntament de Tossa de Mar · 30 days left · 18 Nov 2026](https://tendernation.io/opportunities/01a156a9-63e8-7185-992a-0e5dc4502aee/spain-building-cleaning-services-neteja-i-desinfeccio-dedificis-i-equipamen) [Non-hazardous refuse and waste treatment and disposal services – CTTE1252 Servicio de tratamiento de tierras y escombros de los puntos limpios del Área Metropolitana de Barcelona (AMB) · Tractament I Seleccio de Residus, S.A. · 35 days left · 23 Nov 2026](https://tendernation.io/opportunities/01a156a9-6639-72de-8298-21950a4e3639/spain-non-hazardous-refuse-and-waste-treatment-and-disposal-services-ctte125) [Refuse disposal and treatment – Separace kovů ze škváry · SAKO Brno, a.s. · 37 days left · 25 Nov 2026](https://tendernation.io/opportunities/01a156a9-ca8b-71b6-a1e0-90da1abc58dc/czechia-refuse-disposal-and-treatment-separace-kovu-ze-skvary) [Refuse and waste related services – Odbiór i przyjęcie do zagospodarowania odpadów · Zakład Gospodarki Komunalnej i Mieszkaniowej w Koronowie Sp. z o.o. · 36 days left · 24 Nov 2026](https://tendernation.io/opportunities/01a156aa-0f0f-71bc-8b26-f13445721c21/poland-refuse-and-waste-related-services-odbior-i-przyjecie-do-zagospodarowa) [Refuse and waste related services – „Odbiór i zagospodarowanie odpadów komunalnych od właścicieli nieruchomości zamieszkałych na terenie Gminy Secemin od 1 stycznia do 31 grudnia 2027 r.” · Gmina Secemin · 38 days left · 26 Nov 2026](https://tendernation.io/opportunities/01a156a9-6441-73e1-b701-ab4cefc99281/poland-refuse-and-waste-related-services-odbior-i-zagospodarowanie-odpadow)