Source: https://tendernation.io/opportunities/01a13cca-401c-701d-9c5c-be3f42f887f1/decarbonisation-consultant-soft-market-testing-2023

closed GB open procedure Suitable for SMEs

# Decarbonisation Consultant - Soft Market Testing 2023

[University of Essex](https://tendernation.io/buyers/university-of-essex)

Estimated value

£250,000

Published

14 Aug 2023

Deadline

Closed

28 Aug 2023

## Who can bid

- Buyer says suitable for SMEs

    The buyer ticked “suitable for SMEs” on the notice. Anyone can still bid.
- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

[More contracts for small businesses and VCSEs](https://tendernation.io/opportunities/for-small-businesses)

## About this tender

\*\*SOFT MARKET TESTING ONLY\*\*

### Introduction

The University has three campuses at Colchester, Southend and Loughton, with the largest and most significant at Colchester. Across the campuses are c.54 buildings (47/53 split of residential to non-residential buildings), from a historic Grade II Listed hotel to a carbon zero business school. A significant design element at the Colchester campus is the 1960's brutalist architecture that dominates the central area, with its combination of single pane glass and exposed concrete construction.

In December 2020 the University declared a Climate and Ecological Emergency and in May 2021 the University set a target to reach net zero scope 1 and 2 carbon emissions by 2035 from a 2019 baseline of 12,300 tonnes, with a maximum of 3,000 tonnes of offsetting. The University has reduced its scope 1 and 2 carbon emissions from a peak of 18,851 in 2012 to 8,997 tonnes in 2020 due to the COVID-19 pandemic. Emissions have risen back to 10,475 tonnes in 2021. The University has also set a target to reduce energy consumption from the built environment by 76% from a 2019 baseline by 2035.

Our buildings heating and hot water is predominantly produced by traditional gas boilers and wet radiators. Across our three campuses we also have electric radiators, electric boilers, ground and air source heat pumps, chillers and comfort cooling units.

Energy and carbon reduction work to date has focused on lighting upgrades and sensors, replacement aging boilers with new efficient models, BMS upgrades and PV panels. Limited building fabric work has taken place. Scoped energy and carbon reduction projects for the next 18 months include further PV panels, roof insulation, LED lighting upgrades, air source heat pumps and further electric radiators.

### Requirements and Deliverables

The University requires a plan setting out the enhancements required to its built environment, to realise its aspirations and to formalise its journey to net zero scope 1 and 2 carbon emissions by 2035. The University also wishes to gain clarity what capital will be required to achieve net zero scope 1 and 2 carbon emissions by 2035 and as the estates heating is decarbonised, how the energy mix will alter.

The requirements are split across four parts as follows:

â&#128;¢ Part 1 - Detailed scoping of buildings across three campuses.

â&#128;¢ Part 2 - Carbon management/decarbonisation plan.

â&#128;¢ Part 3 - Energy mix exercise as heating is decarbonised.

Read full description

## CPV classification

Environmental engineering consultancy services

Source

Contracts Finder (UK)

[View official notice](https://www.contractsfinder.service.gov.uk/notice/c79eac61-6b72-42f9-95eb-e1b14d0ee957)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile University of Essex: past awards and live tenders](https://tendernation.io/buyers/university-of-essex) [Sector More Architecture, engineering & surveying tenders](https://tendernation.io/sectors/architecture-engineering-surveying)

## More tenders like this

[Architectural, design and building consultancy services - Dalby Visitor Centre · Forestry Commission · 25 days left · 13 Nov 2026](https://tendernation.io/opportunities/01a15552-1b8a-7041-80fb-e4943876fc38/architectural-design-and-building-consultancy-services-dalby-visitor-centre) [Asbestos Management Framework · Home Group · 25 days left · 13 Nov 2026](https://tendernation.io/opportunities/01a15476-5fff-736e-ae2e-0c8a400c7297/asbestos-management-framework) [Infrastructure works consultancy services – Contrôle extérieur des chaussées · Collectivité européenne d Alsace · 29 days left · 17 Nov 2026](https://tendernation.io/opportunities/01a15183-1730-733b-8247-a32bbbe2211c/france-infrastructure-works-consultancy-services-controle-exterieur-des-chau) [Architectural, construction, engineering and inspection services – Būvprojekta izstrāde un autoruzraudzība fasādes siltināšanai kārtās Dzirciema ielā 16, Rīgā – 1.kārta, C korpuss · Rīgas Stradiņa universitāte · 28 days left · 16 Nov 2026](https://tendernation.io/opportunities/01a15183-3915-73d1-83e6-c378f9f7a926/latvia-architectural-construction-engineering-and-inspection-services-buvp) [Technical assistance services – Suivi et gestion de chantiers de réhabilitation de sites pollués · SPAQuE · 15 days left · 3 Nov 2026](https://tendernation.io/opportunities/01a15183-155e-73c2-a593-9e17375422ac/belgium-technical-assistance-services-suivi-et-gestion-de-chantiers-de-rehab) [Architectural, construction, engineering and inspection services – Single Party Framework Agreement for Architect Led Integrated Design Team Services for Fire Safety Remediation Works for Dublin City Council · Dublin City Council · 5 days left · 23 Oct 2026](https://tendernation.io/opportunities/01a15183-0a15-7156-849b-5a223dd6d615/ireland-architectural-construction-engineering-and-inspection-services-sin)
