[Skip to main content](#main-content)

pendingGBopen procedureSuitable for SMEs

# EPC Framework

[Gentoo Group](https://tendernation.io/buyers/gentoo-group)

Estimated value

Not stated

Published

13 Jul 2023

Deadline

Rolling deadline

## Who can bid

- Buyer says suitable for SMEs

    The buyer ticked “suitable for SMEs” on the notice. Anyone can still bid.
- Sets up a framework

    Winning a place does not guarantee work: contracts are awarded later as call-offs, and the list usually stays closed for years.
- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

[More contracts for small businesses and VCSEs](/opportunities/for-small-businesses)## About this tender

Gentoo Group is a Registered Social Landlord that owns and manages approximately 28,000 properties across the boundaries of Sunderland, Houghton, Hetton and Washington - Tyne and Wear.

The Group is currently working to ensure that all of its properties meet an EPC standard of "C" or higher by the year 2030.

The purpose of this Framework is to procure a number of Contractors to ensure that this target is met.

Gentoo are seeking to procure multi-disciplinary Contractors to carry out the following combinations of works:

- Loft Insulation;
- Cavity Wall Insulation;
- Removal of secondary heating systems (Electric/Gas fires);
- Installation of low-energy lighting;
- Installation of insulation to water cylinders;
- Upgrading existing heating controls to wet systems;
- Mechanical extraction (Installation/replacement of extractor fans);
- Retrofit of trickle vents to windows; and
- Installation of new heating systems.

The works are to be broken into 3 Lots, Lots 1 and 2 will provide an equal split of works listed above, excluding the installation of heating systems - which will form the basis of works for Lot 3.

It is still to be confirmed, but at the time of writing Gentoo intend to appoint a maximum of 4 Contractors to each of the 3 Lots.

Tenderers will be able to bid for all 3 Lots, and may attain a place on each Framework Lot - but will only be able to deliver a maximum of 2 Lots at any one time - Lots 1 and 3 or Lots 2 and 3 together. Alternatively, Gentoo may award all 3 Lots to separate Providers dependent upon the number and quality of bids received.

Gentoo are currently working on retrieving the data and firming up the scope of works to each property, however Lots 1 and 2 will also require the Contractor to carry out any necessary pre-survey works and to hand over any necessary evidential certification on completion of each property to confirm it meets a minimum of EPC band "C".

The Tender is expected to be published in mid-September 2023 with returns expected by mid-late October 2023. Award of the Framework will be made in February 2024, subject to Gentoo Group Board approval and commencement is to be agreed shortly thereafter with the successful Contractors. The Framework will run for a duration of 4 years until February 2028.

The overall budget, split across the 3 Lots is approximately Â£12million over the 4 years. It has not yet been determined how this budget will be split year-on-year but efforts will be made to ensure an equal budget for each year of the Framework.

To allow Bidders the opportunity to discover more details regarding this Framework, a pre-market engagement session is to be held on Monday 4 September 2023 at 2pm. To register your interest in this session, please register here: [events.teams.microsoft.com](https://events.teams.microsoft.com/event/7158b85d-01d6-463c-a477-42858cb75535@40d8f26a-4584-466e-9fee-b7a28c4c7cbc) this event will be held via Microsoft Teams.

Additional information: To allow Bidders the opportunity to discover more details regarding this Framework, a pre-market engagement session is to be held on Monday 4 September 2023 at 2pm. To register your interest in this session, please register here: [events.teams.microsoft.com](https://events.teams.microsoft.com/event/7158b85d-01d6-463c-a477-42858cb75535@40d8f26a-4584-466e-9fee-b7a28c4c7cbc) this event will be held via Microsoft Teams.

Read full description

## CPV classification

Domestic lights

Source

Contracts Finder (UK)

[View official notice ](https://www.contractsfinder.service.gov.uk/notice/0194e8b4-0358-4bbb-b2e2-7a773953a421)

 Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free ](/register)

[Buyer profileGentoo Group: past awards and live tenders](https://tendernation.io/buyers/gentoo-group)[SectorMore Electrical equipment &amp; lighting tenders](https://tendernation.io/sectors/electrical-equipment-lighting)

## More tenders like this

[Low-voltage cable – samonosilni kabelski SNOP (sks) TER obesni in spojni material

ELEKTRO MARIBOR, podjetje za distribucijo električne energije, d.d.

23 days left

9 Nov 2026](https://tendernation.io/opportunities/01a14210-2f46-72c9-8db0-38488c0fcdae/slovenia-low-voltage-cable-samonosilni-kabelski-snop-sks-ter-obesni-in-spo)[Switchgear – Erneuerung UW Hemelingen

wesernetz Bremen GmbH

34 days left

20 Nov 2026](https://tendernation.io/opportunities/01a14210-306b-7328-8fbc-cc5728fdd456/germany-switchgear-erneuerung-uw-hemelingen)[High-voltage cable – Dostawa systemów kablowych 220 kV wraz z opracowaniem projektu budowlanego i pozyskaniem pozwolenia na budowę dla linii 220 kV Ełk Bis – Granica RP w ramach projektu „Połączenia międzysystemowego między Polską a Litwą (obecnie znane jako Harmony Link) wraz z przyłączeniem Suwalskiej Specjalnej Strefy Ekonomicznej

Polskie Sieci Elektroenergetyczne Spółka Akcyjna

37 days left

23 Nov 2026](https://tendernation.io/opportunities/01a1420f-fd2a-70bb-a6e9-18b788a7a40f/poland-high-voltage-cable-dostawa-systemow-kablowych-220-kv-wraz-z-opracowan)[Generator units – Dostawa agregatów prądotwórczych

Miasto Bydgoszcz

12 days left

29 Oct 2026](https://tendernation.io/opportunities/01a14210-1c98-72c1-9784-d5d0da7e50f7/poland-generator-units-dostawa-agregatow-pradotworczych)[Electrical equipment and apparatus – Acuerdo marco para la adquisición de material eléctrico, electrónico y electrodomésticos por la Diputación Foral de Bizkaia y las entidades adheridas durante los años 2027, 2028 y 2029

Diputación Foral de Bizkaia - Departamento de Administración Pública y Relaciones Institucionales

30 days left

16 Nov 2026](https://tendernation.io/opportunities/01a14210-00a9-71c0-b901-8b32f974f910/spain-electrical-equipment-and-apparatus-acuerdo-marco-para-la-adquisicion-d)[Electrical supplies and accessories – Constituye el objeto del contrato el suministro de material eléctrico para el mantenimiento del alumbrado público y de las instalaciones eléctricas de los edificios municipales

Alcaldia del Ayuntamiento de Marratxí

37 days left

23 Nov 2026](https://tendernation.io/opportunities/01a14210-4164-7245-b1b9-b61a68ba46d5/spain-electrical-supplies-and-accessories-constituye-el-objeto-del-contrato)