- Small contract value

    Valued under £135,018 including VAT, the lowest Procurement Act threshold for goods and services.

## About this tender

### A47 / A11 Thickthorn Interchange

Galliford Try, as the East Region Delivery Partner are delivering the A47 / A11 Thickthorn Interchange project in the county of Norfolk on behalf of Highways England. The project will help relieve congestion at Thickthorn junction by providing two new free-flowing slip roads that will connect the A47 with the A11. The new slip roads will re-route traffic away from the junction and flow it under new underpasses.

The project has recently submitted a Development Consent Order to the Planning Inspectorate and the project is forecast to commence on site in early 2023 and will take around 2 years to complete.

### Package: Earthworks

### Outline Scope of Works

The Earthworks Package consists of two parts:

Stage 1: Early Contractor Involvement. To provide technical and commercial input into the detailed design phase and to formulate the budget and programme for the works.

Stage 2: Construction. To provide all necessary supervision, labour, plant and materials required to undertake the earthworks comprising the excavation, processing, placement and compaction of site won soils and the Import of suitable fill material to form the development platform to support the new road, structures and landscaping. The contractor will also be responsible for the disposal to stockpile or off site of any unacceptable or surplus soils and other materials generated during the bulk earthworks.

Principal Activities Approximate Quantities

### Excavation of class 5a 78,000m3

Excavation excluding class 5a 288,000m3

### Imported Fill 27,000m3

Deposition of fill 219,000m3

Compaction of Fill 244,000m3

### Programme

It is currently anticipated that the Stage 1 ECI works will commence in September 2021.

### Timings

Deadline for Notifications of Interest 16:00 hrs on Friday 4th June 2021

### Galliford Try procurement process

To secure work with Galliford Try, a supplier will need to pass the PAS91 onboarding process administered through Builders Profile. Details will be shared with shortlisted suppliers.

If this package is of interest to your company please contact our procurement team by e-mail via the following email address: , by the above deadline with your notification of interest and details of your capabilities.

Any notifications of interest after the above deadline will not be responded to.

Read full description

## CPV classification

Construction structures and materials; auxiliary products to construction (except electric apparatus)

Source

Contracts Finder (UK)

[View official notice](https://www.contractsfinder.service.gov.uk/notice/b465569d-edbb-4d03-b2e7-b0b7e8d369df)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile galliford try: past awards and live tenders](https://tendernation.io/buyers/galliford-try) [Sector More Construction materials & structures tenders](https://tendernation.io/sectors/construction-materials)

## More tenders like this

[Drinking-water piping – Lieferung von Material für die Trinkwasserversorgung (PE-HD-Rohr) für die Trinkwasserversorgung der KOOPERATION WASSER. · Trinkwasserverband Stader Land · 29 days left · 17 Nov 2026](https://tendernation.io/opportunities/01a15183-0b9d-724a-b3ac-6a1b5383af17/germany-drinking-water-piping-lieferung-von-material-fur-die-trinkwasservers) [Construction materials – Fornecimento de Materiais de Construção Civil para o ano de 2027 · Município de Lagoa (Açores) · 27 days left · 14 Nov 2026](https://tendernation.io/opportunities/01a15183-1411-7299-9481-e5274c3efd59/portugal-construction-materials-fornecimento-de-materiais-de-construcao-civi) [Modular and portable buildings – Fourniture, livraison et installation de 5 habitations légères de loisirs (HLL) au camping de la Colombière a Pesmes · Communauté de Communes Val de Gray · 28 days left · 16 Nov 2026](https://tendernation.io/opportunities/01a15183-5cdd-730e-a2d6-1022e299032b/france-modular-and-portable-buildings-fourniture-livraison-et-installation) [Smiths' wares – Fournitures d'atelier : Serrurerie - Quincaillerie · Nievre Habitat · 29 days left · 17 Nov 2026](https://tendernation.io/opportunities/01a15183-c593-71cf-99c0-59c343efbbd0/france-smiths-wares-fournitures-datelier-serrurerie-quincaillerie) [Building materials – Dostawy materiałów ogniotrwałych formowanych · Sieć Badawcza Łukasiewicz-Instytut Metali Nieżelaznych · 18 days left · 6 Nov 2026](https://tendernation.io/opportunities/01a15183-4d1a-7143-ae91-f1f0c3bdd6a9/poland-building-materials-dostawy-materialow-ogniotrwalych-formowanych) [Building materials – Fourniture de matériels et matériaux · Ville de Saint-Just Saint-Rambert · 28 days left · 16 Nov 2026](https://tendernation.io/opportunities/01a15183-1461-73f3-8616-e84751ddcbff/france-building-materials-fourniture-de-materiels-et-materiaux)