Source: https://tendernation.io/opportunities/01a13c6f-fbf6-712d-894b-7c8235f5746c/thames-tideway-tunnel-c405-main-works-west-connection-culvert-propping-steel

awarded GB open procedure

# Thames Tideway Tunnel - C405 Main Works West - Connection Culvert Propping Steel

[BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)](https://tendernation.io/buyers/bmb-joint-venture-bam-nuttall-morgan-sindall-plc-balfour-beatty)

Estimated value

£1

Published

21 Nov 2019

Deadline

Closed

5 Dec 2019

## Who can bid

- Small contract value

    Valued under £135,018 including VAT, the lowest Procurement Act threshold for goods and services.
- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

## About this tender

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.

The Project comprises:

- tunnels:
- a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works

ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel.

- Worksites:
- five main tunnel Worksites (drive and/or reception sites)

ii. 16 CSO Worksites

iii. two System modification Worksites Thames Tideway Tunnel

iv. works at Beckton Sewage Treatment works.

### Section 4: Scope of Works

Supply of propping steel as per the Drawing Package.

Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.

Quotations will be evaluated based on;

### Cost

### Timeliness of return

Adherence to and demonstration of understanding of the drawings and specifications provided at this point.

Provision of accurate product specifications to accompany the quotation.

Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.

Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)

HAMPS: Hammersmith Pumping Station, Distillery Road, Hammersmith, W6 9AD

Additional information: HAMPS: Hammersmith Pumping Station, Distillery Road, Hammersmith, W6 9AD

Read full description

## CPV classification

Structural steelworks

Source

Contracts Finder (UK)

[View official notice](https://www.contractsfinder.service.gov.uk/notice/58dd4241-04df-4e6d-a50e-9d7871fe7adb)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty): past awards and live tenders](https://tendernation.io/buyers/bmb-joint-venture-bam-nuttall-morgan-sindall-plc-balfour-beatty) [Sector More Construction work tenders](https://tendernation.io/sectors/construction-work)

## More tenders like this

[Bannister Sports Centre Athletic Track Soft Market Testing Exercise · Harrow Council · 38 days left · 26 Nov 2026](https://tendernation.io/opportunities/01a1540d-d9e4-71cb-ad57-1603e9042fec/bannister-sports-centre-athletic-track-soft-market-testing-exercise) [Building construction work – Budowa budynku mieszkalnego wielorodzinnego wraz z infrastrukturą techniczną w miejscowości Szczucin · KZN SIM Tarnów Sp. z o.o. · 7 days left · 26 Oct 2026](https://tendernation.io/opportunities/01a156a9-d859-7328-9ee6-a304ce645326/poland-building-construction-work-budowa-budynku-mieszkalnego-wielorodzinneg) [Plastering work – Modernisierung und Erweiterung Matthias-Claudius-Heim Würzburg · Diakonisches Werk Würzburg e.V. · 1 day left · 20 Oct 2026](https://tendernation.io/opportunities/01a156a9-e605-706f-8937-7f0ba18339c0/germany-plastering-work-modernisierung-und-erweiterung-matthias-claudius-hei) [Floor-covering work – Universität Leipzig, Leuschnerplatz, Global Hub, Forschungsneubau · Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Zentrale, Zentralstelle Vergabe- und Vertragsmanagement · 3 days left · 22 Oct 2026](https://tendernation.io/opportunities/01a156a9-acfc-73ee-baab-9e699f88521a/germany-floor-covering-work-universitat-leipzig-leuschnerplatz-global-hub) [Heating plant construction work – Petrašiūnų elektrinės elektrifikacija, įrengiant elektros energijos kaupimo įrenginius, dyzelinį generatorių ir rekonstruojant 6 kV skirstyklą (projektavimas ir rangos darbai) · Akcinė bendrovė „Kauno energija“ (PV) · 7 days left · 26 Oct 2026](https://tendernation.io/opportunities/01a156a9-6f1d-727f-a077-bc25dec93b92/lithuania-heating-plant-construction-work-petrasiunu-elektrines-elektrifikac) [Demolition work – Rück- und Neubau Lichthochmaste · Hamburg Verkehrsanlagen GmbH · 7 days left · 26 Oct 2026](https://tendernation.io/opportunities/01a156a9-6ef0-7276-94e2-d5fa0cb2d6c7/germany-demolition-work-ruck-und-neubau-lichthochmaste)
