# A303 Sparkford to Ilchester Kerbs, Footways & Paved Areas

[galliford try](https://tendernation.io/buyers/galliford-try)

Estimated value

Not stated

Published

30 Mar 2020

Deadline

Closed

25 Mar 2021

## Who can bid

- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

## About this tender

NOTIFICATION OF SUBCONTRACT PACKAGE

### A303 Sparkford to Ilchester

Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout.

The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete.

Package: KERBS, FOOTWAYS & PAVED AREAS

### Outline Scope of Works

This document refers to the kerbing, footways and paved areas package. The scope of the works is to provide all management, supervision and labour to provide the footpath construction works, including the laying of all kerbing, edgings and paving slabs and footpath sub-base to agreed levels all as detailed in the attached subcontract documentation.

A Bill of Quantities is provided along with layout drawings. The majority of the new A303 dual carriageway sits to the north of the existing A303 however the new and existing carriageways cross at approx. ch3300 & ch3750.

### Programme

It is currently anticipated that the kerbs, footways and paved area works will commence in September 2021.

### Timings

Deadline for Notifications of Interest 17:30hrs 2nd April 2020

### Deadline for tender submission 17:30hrs 9th April 2020

If this package is of interest to your company please contact the Managing QS \[Adrian Paddock\] by e-mail on , by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued.

Additional information: NOTIFICATION OF SUBCONTRACT PACKAGE

### A303 Sparkford to Ilchester

Galliford Try, as the South West Regional Delivery Partner are delivering the A303 Sparkford to Ilchester dualling project in the county of Somerset on behalf of Highways England. The project involves the design and construction of 5.6km of new dual lane all-purpose carriageway, connecting the existing dual carriageway at the Sparkford and Podimore Bypasses, therefore creating a continuous dual carriageway between Mere and the Podimore Roundabout.

The project is currently awaiting the approval of the Development Consent Order from the Secretary of State for Transport and this is expected to be given in early Spring 2020. Subject to receiving approval, the project is forecast to commence on site in late summer 2020 and will take around 2 years to complete.

Package: KERBS, FOOTWAYS & PAVED AREAS

### Outline Scope of Works

This document refers to the kerbing, footways and paved areas package. The scope of the works is to provide all management, supervision and labour to provide the footpath construction works, including the laying of all kerbing, edgings and paving slabs and footpath sub-base to agreed levels all as detailed in the attached subcontract documentation.

A Bill of Quantities is provided along with layout drawings. The majority of the new A303 dual carriageway sits to the north of the existing A303 however the new and existing carriageways cross at approx. ch3300 & ch3750.

### Programme

It is currently anticipated that the kerbs, footways and paved area works will commence in September 2021.

### Timings

Deadline for Notifications of Interest 17:30hrs 2nd April 2020

### Deadline for tender submission 17:30hrs 9th April 2020

If this package is of interest to your company please contact the Managing QS \[Adrian Paddock\] by e-mail on , by the above deadline for notifications of interest and a link to the subcontract enquiry documentation can be issued.

Read full description

## CPV classification

Paving materials

Source

Contracts Finder (UK)

[View official notice](https://www.contractsfinder.service.gov.uk/notice/3975a914-8a6f-4f8c-8d7e-a809d9724e7b)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile galliford try: past awards and live tenders](https://tendernation.io/buyers/galliford-try) [Sector More Construction materials & structures tenders](https://tendernation.io/sectors/construction-materials)

## More tenders like this

[Plumbing and heating materials – Marché à bons de commandes - fournitures sanitaires et chauffage · La Dinantaise · 28 days left · 16 Nov 2026](https://tendernation.io/opportunities/01a156a9-f550-736d-908b-05a9208859c8/belgium-plumbing-and-heating-materials-marche-a-bons-de-commandes-fournitu) [Construction materials and associated items – fourniture de materiaux et materiels POUR LE centre technique municipal (batiment, voirie, PARC auto, espaces verts) et controles techniques reglementaires POUR vehicules · Mairie de Millau · 29 days left · 17 Nov 2026](https://tendernation.io/opportunities/01a156a9-6495-71e8-ae4c-8d176d16894c/france-construction-materials-and-associated-items-fourniture-de-materiaux-e) [Modular and portable buildings – Lieferung, Installation, Inbetriebnahme einer Recycling- und Sortierstation mit NIR-Technik, bestehend aus: Los 1: Sortierstation mit NIR-Technik, Los 3: Mechanische Recyclinganlage · Hochschule Niederrhein · 35 days left · 23 Nov 2026](https://tendernation.io/opportunities/01a156a9-6742-71be-8cda-ad55d5cb484e/germany-modular-and-portable-buildings-lieferung-installation-inbetriebnah) [Partitions – Prequalification Contract 2442 Laminate and steel plate doors and Contract 2431 System walls - The New Aker · Helse Sør-Øst RHF · 31 days left · 19 Nov 2026](https://tendernation.io/opportunities/01a156a9-7df1-70ba-83da-fe73ffdd49ba/norway-partitions-prequalification-contract-2442-laminate-and-steel-plate-do) [Cartons – fournitures de conservation · SCN Archives nationales · 35 days left · 23 Nov 2026](https://tendernation.io/opportunities/01a156a9-61aa-736d-b1b5-b65c4249b68d/france-cartons-fournitures-de-conservation) [Construction structures and materials; auxiliary products to construction (except electric apparatus) – FOURNITURES D'ATELIERS · RESAH · 35 days left · 23 Nov 2026](https://tendernation.io/opportunities/01a156a9-72b1-720c-bda9-978cab93d879/france-construction-structures-and-materials-auxiliary-products-to-constructi)