Source: https://tendernation.io/opportunities/01a13c28-da70-7021-b4e9-5400896271bf/demolition-of-open-market-former-cinema-and-access-bridges-bankfield-burnley

awarded GB negotiated without publication procedure Suitable for SMEs

# Demolition of Open Market, former Cinema and Access Bridges - Bankfield, Burnley, Lancashire

[Burnley Borough Council](https://tendernation.io/buyers/burnley-borough-council)

Pays 89% within 30 days

Estimated value

£400,000 to £600,000

Published

31 Mar 2017

Deadline

Closed

12 May 2017

## Who can bid

- Buyer says suitable for SMEs

    The buyer ticked “suitable for SMEs” on the notice. Anyone can still bid.

[More contracts for small businesses and VCSEs](https://tendernation.io/opportunities/for-small-businesses)

## About this tender

The project is for taking down and making good a former cinema block, open-market area, vehicular access bridge and a pedestrian access bridge, all constructed circa 1967. The principal, structural, building elements being in-situ, reinforced concrete beams, columns, floor slabs and roof slabs. Asbestos surveys, condition surveys and utility surveys have been carried-out. These will be made available for tendering companies together with the appropriate technical drawings. There are considerable amounts of amosite and chrysotile asbestos throughout the building structures in a number of material finishes.

The former cinema block is built over a closed market with retail units, service area sub-station and pedestrian access directly below on the ground floor, all of which will remain open for the duration of the works. The block is adjacent and parallel to the adopted highway known as Bankfield. The block has a central, rectangular service core with a cinema unit to each side. Construction generally comprises, in-situ, reinforced concrete frame with brickwork and blockwork infill panels, plastered internally and with fluted, render finish externally. The in-situ, split-level reinforced concrete floors, approximately ten metres above external ground floor level, are interconnected by a series of in-situ, reinforced concrete staircases. The floors have been cast with a gradient appropriate for their use as a cinema. The roof to the cinema block is made up of a 'warm roof' on corrugated, galvanised steel sheeting supported off steel purlins on steel girder trusses at regular intervals supported off the concrete frame. The roof is approximately twenty metres above the adjacent ground level. The in-situ floor to the western cinema unit has been 'levelled-out' for storage purposes by over-boarding on a timber frame supported off the sloping concrete floor.

The former open-market area at first floor level (approximately six metres above external ground level) is a fully enclosed area. Part of the area has the cinema block over. The remaining area is roofed over by a mixture of: original, waterproofed, in-situ, reinforced concrete slab, incorporating roof lights supported by in-situ, reinforced concrete columns at regular intervals; and, an 'atrium-type' glazed roof supported by a steel frame built off the in-situ, reinforced concrete floor slab. The whole of the open-market floor has been waterproofed with an asphalt finish with gradients falling to internal cast-iron rainwater pipes.

The works are located adjacent to Bankfield, Burnley Town Centre, Ordnance Survey grid reference E384035 N432723 and the OS Above Ordnance Datum level at ground level is 110.700m.

Further information on vehicular and pedestrian access is provided in Additional Text section.

Additional information: Description continued: The vehicular access bridge to the open market comprises ramped access and bridge over the River Brun with an elevated parking platform for approximately twenty vehicles over the highway known as Bankfield. The bridge comprises surfaced, in-situ, reinforced concrete deck slab supported by in-situ, reinforced concrete edge/parapet beams constructed off 'V-trestled' cross beams and columns of similar material. The elevated parking platform is made up of a surfaced, in-situ, reinforced concrete deck built off pre-cast, pre-stressed concrete intermediate beams between in-situ, reinforced concrete edge/parapet beams. The deck span is approximately 12 metres and is supported off in-situ, reinforced concrete 'V-trestled' cross beams and columns.

The pedestrian access bridge to the open market over Bankfield comprises surfaced, in-situ, reinforced concrete deck slab supported by in-situ, reinforced concrete edge/parapet beams supported by the open-market edge beam to the South and intermediate, in-situ, reinforced concrete 'V-trestled' cross beams and columns to the North of Bankfield.

To facilitate safe execution of the works Burnley Council will enter into agreement with the Highway Authority, Lancashire County Council, to provide traffic management measures throughout the duration of the works. The exact detail will be determined by all parties for inclusion in the Construction Phase Health and Safety Plan.

The Council estimates the anticipated range of value for this work to be GBP400,000 to GBP600,000. An indication as to the commencement of works on site would be October 2017, with completion in June 2018.

The Council is undertaking a PAS 91 compliant pre-qualification process using PAS 91 core and supplementary questions. Only those suppliers successful at the pre-qualification stage will be considered for the invite to tender stage of this opportunity. The Council anticipates that a maximum of five suppliers will be invited to tender.

The values stated in this notice merely stipulates the Council's anticipated range of value for this work. The focus here is that the Council will be looking to secure competitive rates. There is no suggestion that the lowest price acceptable should be interpreted as the 'lowest actual value' recorded in this notice.

Read full description

## CPV classification

Demolition work

Source

Contracts Finder (UK)

[View official notice](https://www.contractsfinder.service.gov.uk/notice/92f09bfb-dabd-46e5-99cb-5e7451a86854)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile Burnley Borough Council: past awards and live tenders](https://tendernation.io/buyers/burnley-borough-council) [Sector More Construction work tenders](https://tendernation.io/sectors/construction-work)

## More tenders like this

[Building Repairs & Maintenance Lot 1 Electrical Lot 2 Mechanical · Derbyshire Dales District Council · 40 days left · 29 Nov 2026](https://tendernation.io/opportunities/01a15934-2662-73b5-8d63-abd6e1946ccd/building-repairs-maintenance-lot-1-electrical-lot-2-mechanical) [CA18585 - ITT Repair and replacement works to whole site drainage system · Diocese of Norwich Education and Academies Trust · 39 days left · 27 Nov 2026](https://tendernation.io/opportunities/01a1594a-591e-7334-8085-35e92dcd67f8/ca18585-itt-repair-and-replacement-works-to-whole-site-drainage-system) [Bannister Sports Centre Athletic Track Soft Market Testing Exercise · Harrow Council · 37 days left · 26 Nov 2026](https://tendernation.io/opportunities/01a1540d-d9e4-71cb-ad57-1603e9042fec/bannister-sports-centre-athletic-track-soft-market-testing-exercise) [Sgwd cllun gwyn uchaf viewing point · Natural Resources Wales · 30 days left · 19 Nov 2026](https://tendernation.io/opportunities/01a1592e-e9f5-735d-8cc4-bf000883d825/sgwd-cllun-gwyn-uchaf-viewing-point) [Supply Chain Notice: WC1948344 - CIDP26 Islandwide Demolitions, Dhekelia & Episkopi (CYPRUS) · Ministry of Defence · 3 days left · 22 Oct 2026](https://tendernation.io/opportunities/01a1594a-5cd1-73f3-acca-9f779100e58d/supply-chain-notice-wc1948344-cidp26-islandwide-demolitions-dhekelia-episk) [Floor-covering work – Universität Leipzig, Leuschnerplatz, Global Hub, Forschungsneubau · Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Zentrale, Zentralstelle Vergabe- und Vertragsmanagement · 2 days left · 22 Oct 2026](https://tendernation.io/opportunities/01a156a9-acfc-73ee-baab-9e699f88521a/germany-floor-covering-work-universitat-leipzig-leuschnerplatz-global-hub)