Source: https://tendernation.io/opportunities/01a13c23-aad1-7281-8881-2706f44c3007/thames-court-footbridge-remedial-works

closed GB open procedure Suitable for SMEs

# Thames Court Footbridge - Remedial Works

[City of London Corporation](https://tendernation.io/buyers/city-of-london-corporation)

Incumbent usually keeps it

Estimated value

£500,000 to £550,000

Published

8 Aug 2018

Deadline

Closed

6 Aug 2018

## Who can bid

- Buyer says suitable for SMEs

    The buyer ticked “suitable for SMEs” on the notice. Anyone can still bid.
- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

[More contracts for small businesses and VCSEs](https://tendernation.io/opportunities/for-small-businesses)

## About this tender

### Works Scope

The remedial works to Thames Court Footbridge (over Upper Thames Street) comprise the following principal elements: -

- Replacement of two cable stays to the bridge and re-tensioning of all stays, over carriageways and footways to Upper Thames Street
- Bridge drainage maintenance cleaning and improvements
- Replacement of stone stair treads to north and south stair flights
- General maintenance cleaning/washing of soiled paintwork to structural members of bridge/stairs, together with cleaning/washing of retained footbridge paving

In order to implement items A, B and C, it is envisaged that full closures of Upper Thames Street to vehicular traffic in both directions will be required, which will not be possible during the working week.

It is expected that these works (A to C) can be completed within two weekend closure to traffic, although - as a safeguard- three weekend closures are being arranged with Transport for London within the contract period for this purpose.

The Cycle Superhighway is not to be closed during the works under any circumstances. If necessary, a local reduction to the width of the cycle lane will be permitted, with appropriate traffic management and measures to protect cyclists and pedestrians during key safety-critical operations (e.g. lifting or removal of bridge stays), to the prior approval of the highway authority (TFL)

Preliminary traffic management and diversion drawings have been produced, for the purposes of obtaining the necessary road closures and traffic orders in advance. However, the contractor will be responsible for developing these outline drawings into full working traffic management drawings, to the approval of the highway authorities (TFL and City) and for providing all traffic management and signage

Due to the lead-in times for stone paving for the stair treads, these are being procured in advance by the City directly. The contractor will be responsible for taking delivery of and offloading these units and storing for use during the project.

Additional information:

Please register on capitalEsourcing and find the opportunity under itt\_CoL\_8873.

Read full description

## CPV classification

Footbridge construction work

Source

Contracts Finder (UK)

[View official notice](https://www.contractsfinder.service.gov.uk/notice/5a608bc5-6dfe-420a-94b3-45a649204288)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile City of London Corporation: past awards and live tenders](https://tendernation.io/buyers/city-of-london-corporation) [Sector More Construction work tenders](https://tendernation.io/sectors/construction-work)

## More tenders like this

[Bannister Sports Centre Athletic Track Soft Market Testing Exercise · Harrow Council · 38 days left · 26 Nov 2026](https://tendernation.io/opportunities/01a1540d-d9e4-71cb-ad57-1603e9042fec/bannister-sports-centre-athletic-track-soft-market-testing-exercise) [Construction work – (WZNOWIONE POSTĘPOWANIE) Budowa i przebudowa kogeneracji gazowych o łącznej mocy 4,636 MWe i 5,729 MWt w Elektrociepłowni Ciechanów · Elektrociepłownia Ciechanów sp. z o.o. · 6 days left · 26 Oct 2026](https://tendernation.io/opportunities/01a156a9-8e72-7024-a07c-4da735079800/poland-construction-work-wznowione-postepowanie-budowa-i-przebudowa-kogene) [Demolition work – Rück- und Neubau Lichthochmaste · Hamburg Verkehrsanlagen GmbH · 6 days left · 26 Oct 2026](https://tendernation.io/opportunities/01a156a9-6ef0-7276-94e2-d5fa0cb2d6c7/germany-demolition-work-ruck-und-neubau-lichthochmaste) [Heating plant construction work – Petrašiūnų elektrinės elektrifikacija, įrengiant elektros energijos kaupimo įrenginius, dyzelinį generatorių ir rekonstruojant 6 kV skirstyklą (projektavimas ir rangos darbai) · Akcinė bendrovė „Kauno energija“ (PV) · 6 days left · 26 Oct 2026](https://tendernation.io/opportunities/01a156a9-6f1d-727f-a077-bc25dec93b92/lithuania-heating-plant-construction-work-petrasiunu-elektrines-elektrifikac) [Floor-covering work – Universität Leipzig, Leuschnerplatz, Global Hub, Forschungsneubau · Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Zentrale, Zentralstelle Vergabe- und Vertragsmanagement · 2 days left · 22 Oct 2026](https://tendernation.io/opportunities/01a156a9-acfc-73ee-baab-9e699f88521a/germany-floor-covering-work-universitat-leipzig-leuschnerplatz-global-hub) [Building construction work – Budowa budynku mieszkalnego wielorodzinnego wraz z infrastrukturą techniczną w miejscowości Szczucin · KZN SIM Tarnów Sp. z o.o. · 6 days left · 26 Oct 2026](https://tendernation.io/opportunities/01a156a9-d859-7328-9ee6-a304ce645326/poland-building-construction-work-budowa-budynku-mieszkalnego-wielorodzinneg)
