Source: https://tendernation.io/opportunities/01a13c03-6ed5-72d0-a92b-ef7deb1c80cb/lsc2203-refurbishment-of-elizabeth-tower

closed GB restricted procedure

# LSC2203-Refurbishment of Elizabeth Tower

[Parliament UK](https://tendernation.io/buyers/parliament-uk)

Estimated value

£15,000,000

Published

24 Jun 2016

Deadline

Closed

20 Jul 2016

## About this tender

The Corporate Officer of the House of Lords and The Corporate Officer of The House of Commons are undertaking key internal conservation and refurbishment works to the Elizabeth Tower, including waterproofing and addressing condensation problems as well as modernising the building to improve standards in safety, access and visitor and workspace facilities.

Completed in 1856, the Elizabeth Tower was constructed using 2600 cubic metres of brick and 850 cubic metres of stone, all of which were transported to Westminster by river. Designed by architects Charles Barry and Augustus Pugin, it took over 13 years to build. Renamed Elizabeth Tower in 2012, to honour the Queenâ&#128;&#153;s Diamond Jubilee, it is regularly featured in popular culture and is one of the most photographed landmarks in the world.

### Background & Works to Date

To ensure that the UKâ&#128;&#153;s most famous clock continues to keep time, specialist teams carry out regular maintenance and adjustments to the Great Clock. However, it has now been over 31 years since the last extensive works were carried out to maintain the Elizabeth Tower.

Problems have been identified with the clock hands, mechanism and pendulum, which need to be dealt with immediately to ensure that the clock can continue to work properly. Identified areas of concern include cracks in masonry, leaks, erosion, and rusting of metalwork. There is a risk that if not addressed shortly the clock may fail or fabric problems may become acute.

In addition, the Tower needs to be brought in line with fire prevention guidance and health and safety measures for staff and visitors need to be improved. In order to provide a better means of emergency evacuation, a lift will also be installed inside the tower, which will also provide access for maintenance.

The last significant conservation work was completed in 1983-85. This involved the cleaning and repair of the stone, painting and gilding works and repairs to the cast iron roof. The structure was stabilised in 1995/96 as a result of works carried out to the Jubilee Line. Parts of the clock mechanism were serviced in 2007, but other areas havenâ&#128;&#153;t been overhauled in over 25 years.

### Project Objectives

â&#128;¢ Work to prevent the clock mechanism from failing

â&#128;¢ Addressing problems caused by decay to the fabric of the building.

â&#128;¢ Health & safety and fire safety improvements, including installation of a lift.

â&#128;¢ Enhanced energy efficiency through modern lighting of the tower face and other measures.

Overall the projectâ&#128;&#153;s aim is to conserve the Tower for future generations.

The scope of this project includes:

â&#128;¢ Facilitating Works to the Clock (Servicing of the Clock Mechanism to be carried out by Parliamentary Estates Clock Mechanics).

â&#128;¢ Scaffolding/Access.

â&#128;¢ Redecoration of the Cast Iron Roofs.

â&#128;¢ Refurbishment of the Ayrton Light.

â&#128;¢ Refurbishment of the Clock Faces and Hands.

â&#128;¢ Stonework Repair.

â&#128;¢ Structu...

Additional information: The Invitation to Tender PQQ will be accessible at the following website [in-tendhost.co.uk/parliamentuk](http://in-tendhost.co.uk/parliamentuk)

To access these documents select the tender reference LSC2203 in the â&#128;&#152;current tendersâ&#128;&#153; list, click on the â&#128;&#152;view tender detailsâ&#128;&#153; and express interest by clicking on the button provided. You will need to register your company details, thereafter you will be issued with a username and password. If you have previously registered with In-Tend, please follow the link shown which will redirect you to the home page where you can log on using your existing username and password to collect the tender documents. If you have registered and forgotten your username and password, click on the â&#128;&#152;forgotten passwordâ&#128;&#153; link on the In-Tend homepage. Please keep this username and password secure and do not pass it to any third parties. If you are experiencing problems, please contact the In-Tend helpdesk via email:  or call +44 (0)20 7219 1600 for further assistance. Please ensure that you allow yourself plenty of time when responding to this tender prior to the closing date of 12:00 noon 20 July 2016. If you are uploading multiple documents you will have to individually load one document at a time or you can opt to zip all the documents in an application such as WinZip or WinRar.

Is a Recurrent Procurement Type? : No [in-tendhost.co.uk/parliamentuk/aspx](https://in-tendhost.co.uk/parliamentuk/aspx/)

Read full description

## CPV classification

Construction work

Source

Contracts Finder (UK)

[View official notice](https://www.contractsfinder.service.gov.uk/notice/d19ac780-adc9-11e6-9901-0019b9f3037b)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile Parliament UK: past awards and live tenders](https://tendernation.io/buyers/parliament-uk) [Sector More Construction work tenders](https://tendernation.io/sectors/construction-work)

## More tenders like this

[Bannister Sports Centre Athletic Track Soft Market Testing Exercise · Harrow Council · 38 days left · 26 Nov 2026](https://tendernation.io/opportunities/01a1540d-d9e4-71cb-ad57-1603e9042fec/bannister-sports-centre-athletic-track-soft-market-testing-exercise) [Hdc-1714 wadkins pavilion refurbishment · Harborough District Council · 39 days left · 27 Nov 2026](https://tendernation.io/opportunities/01a155bf-f664-72f9-9823-a85d6cddbdc6/hdc-1714-wadkins-pavilion-refurbishment) [Design, supply, and Installation of Newbiggin Skatepark Extension · Newbiggin Town Council · 35 days left · 23 Nov 2026](https://tendernation.io/opportunities/01a15552-19a2-7348-a5cc-3f5ae51ef934/design-supply-and-installation-of-newbiggin-skatepark-extension) [Tender for the design, supply, delivery and installation of a modular UNIT and associated works at ARC healthy living, irvinestown. peaceplus funded upgrade works · Fermanagh and Omagh District Council · 14 days left · 2 Nov 2026](https://tendernation.io/opportunities/01a15552-1b74-73ec-a6f6-a1af37959997/tender-for-the-design-supply-delivery-and-installation-of-a-modular-unit-and-a) [ESPH AB RDC Sidley Depot (ESPH753) · Rother District Council · 49 days left · 7 Dec 2026](https://tendernation.io/opportunities/01a15552-1d19-7155-8fe0-0d917105fca8/esph-ab-rdc-sidley-depot-esph753) [Demolition, Design and Construction of Howard's Lane Public Toilets, Howard's Lane, Wareham · Wareham Town Council · 88 days left · 15 Jan 2027](https://tendernation.io/opportunities/01a15552-1d8a-7277-bc5b-edc9a127ee5b/demolition-design-and-construction-of-howards-lane-public-toilets-howards-la)
