Source: https://tendernation.io/opportunities/01a13bf3-3c70-73b9-9b0e-7840c5acffc9/trn-970012015-review-of-the-evidence-on-the-effects-of-and-response-to-amplitu

closed GB open procedure Suitable for SMEs

# TRN 970/01/2015 Review of the evidence on the effects of and response to amplitude modulation (AM) from wind turbines, with a view to recommending how excessive AM might be controlled through the use of a planning condition

[Department of Energy and Climate Change](https://tendernation.io/buyers/department-of-energy-and-climate-change)

Incumbent usually keeps it

Estimated value

£20,000 to £30,000

Published

27 Mar 2015

Deadline

Closed

21 Apr 2015

## Who can bid

- Buyer says suitable for SMEs

    The buyer ticked “suitable for SMEs” on the notice. Anyone can still bid.
- Small contract value

    Valued under £135,018 including VAT, the lowest Procurement Act threshold for goods and services.
- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

[More contracts for small businesses and VCSEs](https://tendernation.io/opportunities/for-small-businesses)

## About this tender

The Department of Energy and Climate Change (â&#128;&#156;DECCâ&#128;&#157;) wishes to commission a review of the evidence on the effects of and response to amplitude modulation (AM) from wind turbines, with a view to recommending how excessive AM might be controlled through the use of a planning condition. The aims of the project are:

â&#128;¢ To review the available evidence on Amplitude Modulation (AM) in relation to wind turbines, including but not limited to the research commissioned and published by RenewableUK in December 2013.

â&#128;¢ To work closely with the Institute of Acousticsâ&#128;&#153; AM working group, who are expected to recommend a preferred metric and methodology for quantifying and assessing the level of AM in a sample of wind turbine noise data.

â&#128;¢ To review the robustness of relevant dose-response relationships, including the one developed by the University of Salford as part of the RenewableUK study, on which the correction (or penalty) for amplitude modulation proposed as part of its template planning condition is based.

â&#128;¢ To consider how, in a policy context, the level(s) of AM in a sample of noise data should be interpreted, in particular determining at what point it causes a significant adverse impact.

â&#128;¢ To recommend how excessive AM might be controlled through the use of an appropriate planning condition.

â&#128;¢ To consider the engineering/cost trade-offs of possible mitigation measures.

The contractor will be expected to apply the following methodology:

### Phase 1

â&#128;¢ Propose an approach and methodology

â&#128;¢ Prepare a detailed work plan

â&#128;¢ Engage with IOAâ&#128;&#153;s AM Working Group and other external stakeholders, including researchers, planning authorities, developers and RUK (and the contractors that carried out work packages for them), to compile a list of relevant research and evidence

â&#128;¢ Define evidence needs

### Phase 2

â&#128;¢ Review the outputs from the RUK research, in particular:

o the robustness of the study into the subjective response to AM and the conclusions drawn about an appropriate penalty scheme

o the merits of the proposed planning condition, in the context of ETSU-R-97 and Circular 11/95

â&#128;¢ Obtain and review other relevant evidence

â&#128;¢ Summarise (for non-technical audience) main findings of review of evidence

â&#128;¢ Recommend an appropriate penalty scheme (or alternative) for use in a planning condition, compatible with the IOA AM Working Groupâ&#128;&#153;s preferred metric

â&#128;¢ Prepare a report summarising the main findings and setting out clear recommendations, in a form suitable for publication by DECC. (The report should discuss the limitations of the evidence on which the recommendations are based.)

â&#128;¢ Present the main findings and recommendations to the IOAâ&#128;&#153;s AM Working Group and, separately, to DECCâ&#128;&#153;s Steering Group for this work.

The contractor will be expected to work closely with the IOAâ&#128;&#153;s AM Working Group throughout the project. They will also be required to attend DECCâ&#128;&#153;s Steering Group meetings as appropriate.

Additional information: Please note: This contract may be withdrawn and not awarded should there be a change in DECC policy following the General Election.

â&#128;¢ To review the available evidence on Amplitude Modulation (AM) in relation to wind turbines, including but not limited to the research commissioned and published by RenewableUK in December 2013.

â&#128;¢ To work closely with the Institute of Acousticsâ&#128;&#153; AM working group, who are expected to recommend a preferred metric and methodology for quantifying and assessing the level of AM in a sample of wind turbine noise data.

â&#128;¢ To review the robustness of relevant dose-response relationships, including the one developed by the University of Salford as part of the RenewableUK study, on which the correction (or penalty) for amplitude modulation proposed as part of its template planning condition is based.

â&#128;¢ To consider how, in a policy context, the level(s) of AM in a sample of noise data should be interpreted, in particular determining at what point it causes a significant adverse impact.

â&#128;¢ To recommend how excessive AM might be controlled through the use of an appropriate planning condition.

â&#128;¢ To consider the engineering/cost trade-offs of possible mitigation measures.

The contractor will be expected to apply the following methodology:

### Phase 1

â&#128;¢ Propose an approach and methodology

â&#128;¢ Prepare a detailed work plan

â&#128;¢ Engage with IOAâ&#128;&#153;s AM Working Group and other external stakeholders, including researchers, planning authorities, developers and RUK (and the contractors that carried out work packages for them), to compile a list of relevant research and evidence

â&#128;¢ Define evidence needs

### Phase 2

â&#128;¢ Review the outputs from the RUK research, in particular:

o the robustness of the study into the subjective response to AM and the conclusions drawn about an appropriate penalty scheme

o the merits of the proposed planning condition, in the context of ETSU-R-97 and Circular 11/95

â&#128;¢ Obtain and review other relevant evidence

â&#128;¢ Summarise (for non-technical audience) main findings of review of evidence

â&#128;¢ Recommend an appropriate penalty scheme (or alternative) for use in a planning condition, compatible with the IOA AM Working Groupâ&#128;&#153;s preferred metric

â&#128;¢ Prepare a report summarising the main findings and setting out clear recommendations, in a form suitable for publication by DECC. (The report should discuss the limitations of the evidence on which the recommendations are based.)

â&#128;¢ Present the main findings and recommendations to the IOAâ&#128;&#153;s AM Working Group and, separately, to DECCâ&#128;&#153;s Steering Group for this work.

The contractor will be expected to work closely with the IOAâ&#128;&#153;s AM Working Group throughout the project. They will also be required to attend DECCâ&#128;&#153;s Steering Group meetings as appropriate.

Read full description

## CPV classification

Research and development services and related consultancy services

Source

Contracts Finder (UK)

[View official notice](https://www.contractsfinder.service.gov.uk/notice/444d26a5-adc8-11e6-9901-0019b9f3037b)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile Department of Energy and Climate Change: past awards and live tenders](https://tendernation.io/buyers/department-of-energy-and-climate-change) [Sector More Research & development tenders](https://tendernation.io/sectors/research-development)

## More tenders like this

[Tees Bird Mapping Project · Natural England · 24 days left · 13 Nov 2026](https://tendernation.io/opportunities/01a158c1-0a39-72df-aac0-991d1747cd02/tees-bird-mapping-project) [Research services – Evaluatie van de implementatie van de proeftuin Pioniersscholen · Vlaamse Overheid · 20 days left · 9 Nov 2026](https://tendernation.io/opportunities/01a156a9-cecf-7255-bee1-542f502ed088/belgium-research-services-evaluatie-van-de-implementatie-van-de-proeftuin-pi) [Research services – KPN/28/2026 „Charakterystyka biogeochemiczna gleb i roślin wybranych torfowisk subalpejskich ze szczególnym uwzględnieniem torfowiska u źródeł Úpy na Równi pod Śnieżką” · Karkonoski Park Narodowy z siedzibą w Jeleniej Górze · 34 days left · 23 Nov 2026](https://tendernation.io/opportunities/01a156a9-97ae-7315-8e1a-e686bca1e724/poland-research-services-kpn282026-charakterystyka-biogeochemiczna-gleb-i) [Research and development services and related consultancy services – Evaluation of Five Pilot Projects Testing Exemptions from Provisions of the Local Government Act, the Property Tax Act, the General Practitioner Regulations, and Other Regulatory Frameworks · Ministry of Local Government and Regional Development · 14 days left · 3 Nov 2026](https://tendernation.io/opportunities/01a156a9-a35e-73b3-8bf4-7d33c32cf58b/norway-research-and-development-services-and-related-consultancy-services-ev) [Research and development services and related consultancy services – Zabezpečenie trvalých a analytických činností pre oblasť dopravy · Ministerstvo dopravy Slovenskej republiky · 30 days left · 19 Nov 2026](https://tendernation.io/opportunities/01a156a9-ce90-72fd-b25d-99b3ee2e8b4b/slovakia-research-and-development-services-and-related-consultancy-services) [Research and development consultancy services – ATU wishes to establish a Panel of National Contact Point Experts across EU Member States to build capacity to incorporate EU Results-Based Payments Schemes in Public or Private Support Schemes. · Atlantic Technological University · 438 days left · 31 Dec 2027](https://tendernation.io/opportunities/01a156a9-ccf1-7050-b440-6554b4a1426f/ireland-austria-slovenia-research-and-development-consultancy-services-atu)
