Source: https://tendernation.io/opportunities/01a13bd8-17d9-712f-b4c9-25164e243268/root-to-market-dynamic-market-for-regenerative-procurement

Open for bids GB open procedure Suitable for SMEs

# ROOT to Market Dynamic Market for Regenerative Procurement

[Heart Academies Trust](https://tendernation.io/buyers/heart-academies-trust)

Estimated value

Not stated

Published

12 Mar 2026

Deadline

3451 days left

31 Mar 2036

## Who can bid

- Buyer says suitable for SMEs

    The buyer ticked “suitable for SMEs” on the notice. Anyone can still bid.
- Buyer says suitable for VCSEs

    The buyer ticked “suitable for voluntary, community and social enterprises” on the notice.
- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

[More contracts for small businesses and VCSEs](https://tendernation.io/opportunities/for-small-businesses)

## About this tender

Regeneration Over Extraction. Suppliers must seek to:

 Prioritise materials and products that restore, replenish, or enhance natural living systems.

 Avoid extractive materials that degrade ecosystems, deplete finite resources, or cause long term environmental harm.

 Use resource efficiently and maximise material lifespans through good design and appropriate material use

 Demonstrate a clear transition plan away from extractive inputs where alternatives are not yet available.

 Minimise embodied carbon in construction materials (e.g., concrete, steel, insulation).

 Prioritise regenerative or circular construction materials (e.g., reclaimed steel, recycled aggregates, lower embodied carbon concrete alternatives, timber from regenerative forestry).

 Avoid extractive materials linked to high impact mining (e.g., virgin aggregates, aluminium, PVC).

 Seek to design for deconstruction, enhancing the residual value of materials at the end of design life and reducing future reliance on extractive practices

Ethical and Non-Exploitative Supply Chains. Suppliers must seek to:

 Ensure all labour practices across their supply chain are fair, safe, and free from exploitation.

 Avoid sourcing from suppliers or regions associated with forced labour, unsafe working conditions, or unfair pay.

 Maintain transparent supply chain mapping and provide evidence of due diligence on request.

 Ensure fair and safe working conditions on construction sites.

2.3 Climate Friendly Operations. Suppliers must seek to:

 Minimise carbon, water and waste in their organisations and core operations.

 Specifically minimise greenhouse gas emissions across production, transport, and distribution.

 Prioritise low carbon materials, renewable energy, and efficient logistics.

 Minimise whole life carbon impacts in design and materials, optimising embodied carbon together with operational efficiency.

 Reduce site emissions (plant, generators, transport) and use electric or low emission plant and machinery.

 Implement site level water management and waste segregation plans.

 Demonstrate continuous improvement in reducing their carbon footprint, water usage and waste production, supported by measurable data where possible.

 Drive design towards deconstruction practices and offer (and advocate for) regenerative material options to replace more mainstream materials



Nature Enhancing Practices. Suppliers must seek to:

 Adopt practices that actively improve soil health, biodiversity, water quality, and ecosystem resilience.

 Use regenerative agricultural, manufacturing, or operational methods wherever feasible.

 Avoid chemicals, processes, or materials known to harm biodiversity or natural habitats.

 Implement nature positive site practices.

 Ensure soil protection and restoration before and after works.

 Avoid habitat disturbance and protect ecological features during construction.

Circularity and Resource Stewardship. Suppliers must seek to:

 Maximise recycled, reclaimed, or up-cycled materials.

 Design products and packaging for reuse, repair, or recycling.

 Minimise waste generation and avoid single use materials unless essential for safety or compliance.

 Design for reuse, modularity and disassembly.

 Maximise reuse of demolition materials.

 Avoid single use construction materials (e.g. plastic sheeting)

 Offer and opt for the use of bio-based and recovered materials wherever viably possible

Read full description

## CPV classification

Petroleum products, fuel, electricity and other sources of energy Mining, basic metals and related products Agricultural machinery Leather and textile fabrics, plastic and rubber materials Electrical machinery, apparatus, equipment and consumables; lighting Security, fire-fighting, police and defence equipment Collected and purified water Industrial machinery Machinery for mining, quarrying, construction equipment Construction structures and materials; auxiliary products to construction (except electric apparatus)

Source

Find a Tender (UK) · Notice ocds-h6vhtk-06680d-2026-03-12T10:21:54Z

[View official notice](https://www.find-tender.service.gov.uk/Notice/ocds-h6vhtk-06680d-2026-03-12T10:21:54Z)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile Heart Academies Trust: past awards and live tenders](https://tendernation.io/buyers/heart-academies-trust) [Sector More Fuels, energy & petroleum products tenders](https://tendernation.io/sectors/fuels-energy)

## More tenders like this

[KMCFM-001 Construction Materials and Ancillary Products DPS · Kirklees Council · 1652 days left · 28 Apr 2031](https://tendernation.io/opportunities/01a13c74-bcd8-72f2-8a43-3771d85e36c6/kmcfm-001-construction-materials-and-ancillary-products-dps) [Estates Works and Capital Projects Dynamic Market · Embark Multi Academy Trust · 1602 days left · 9 Mar 2031](https://tendernation.io/opportunities/01a13bd7-e8c2-715c-b12e-0bae4115e655/estates-works-and-capital-projects-dynamic-market) [Dynamic Purchasing System - Construction Materials Application Stage · GreenSquareAccord Limited · 590 days left · 31 May 2028](https://tendernation.io/opportunities/01a13ba9-b841-7303-9c5f-c10a4fab52b9/dynamic-purchasing-system-construction-materials-application-stage) [Dynamic Purchasing System (DPS) for Sustainable and Ethically sourced Works/Construction projects (including professional services) delivering decarbonisation, biodiversity, energy efficiency, estate management and social value in local communities · Bishop Wilkinson Catholic Education Trust · 425 days left · 19 Dec 2027](https://tendernation.io/opportunities/01a13cc8-82a8-7036-81ce-751269456cf3/dynamic-purchasing-system-dps-for-sustainable-and-ethically-sourced-workscons) [Dynamic Purchasing System - Construction Materials · GreenSquareAccord Limited · 590 days left · 31 May 2028](https://tendernation.io/opportunities/01a13ba9-be3f-73b1-897e-c4e61600a187/dynamic-purchasing-system-construction-materials) [Ground Care, Agricultural and Plant Equipment for Defra Group Fleet Services · Environment Agency · 3 days left · 22 Oct 2026](https://tendernation.io/opportunities/01a13bd9-b536-703c-b06e-0971a0f35b5b/ground-care-agricultural-and-plant-equipment-for-defra-group-fleet-services)
