Source: https://tendernation.io/opportunities/01a13bd3-9658-71ed-9653-b91375a917ee/thermal-buffer-technology

[Skip to main content](#main-content)

pendingGBopen procedure

# Thermal Buffer Technology

[United Kingdom Industrial Fusion Solutions](https://tendernation.io/buyers/united-kingdom-industrial-fusion-solutions)

Estimated value

Not stated

Published

28 Jan 2026

Deadline

Rolling deadline

## Who can bid

- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

## About this tender

The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification.

UKIFS is seeking experts to support the design and development of a thermal storage system that integrates with the STEP power cycle. While the power cycle is designed to efficiently integrate heat from the tokamak device during a high power steady state scenario, the power cycle and cooling systems must also be highly flexible to adapt to uncertain prototypic operations e.g. the systems must have the ability to switch on and off and ramp up and down at the start and end of operational periods. Significant thermal power will be generated from the tokamak device during the ‘rapid density rise phase’ of the reactor plasma ramp up, lasting a few minutes. This is an effective ramp of 2GWth generated from the tokamak during these few minutes.

To manage this very immediate and sudden generation of heat from the tokamak, a minimum amount of thermal storage will be needed to increase the thermal inertia of the primary coolant loops, allowing the power cycle to ramp up to 100% load in a timely manner. Further, thermal storage may be needed to enable partial operation of the power cycle during the transition between the initial pre-heat to part load operational period.

The thermal storage system will be expected to extract heat from a hot CO2 primary coolant during the ramp up phase and deliver heat back to the CO2 primary coolant (or to a separate secondary working fluid) during the ramp down phase. The proposed technical operating conditions of the thermal storage system and load requirements are:

-CO2 primary coolant operating pressure: 50 to 150 bar.

-CO2 primary coolant operating temperature: 550°C to 650°C.

-Thermal duty in the region of 800MW.

-Required energy storage of 150MWh.

-Required fast ramping duration in a few minutes.

Systems of interest &amp; key words:

-Thermal energy storage

-Latent heat storage

-Sensible heat storage

-Thermochemical heat storage

-Thermal battery

-Molten salt storage systems

-Molten salt heat exchangers/ steam generators

-Phase change materials

-Metallic phase change materials

-Solid state energy storage

-Packed bed storage

-Concrete battery

-Sand battery

Please note that the CPV codes given in this notice have now been corrected.

To view this notice, please click here:

[ukifs.delta-esourcing.com/delta/viewNotice.html](https://ukifs.delta-esourcing.com/delta/viewNotice.html?noticeId=1009995808)

Read full description

## CPV classification

Construction works for power plants and heating plantsThermal power plant construction workDesign and execution of research and development

Source

Find a Tender (UK) · Notice ocds-h6vhtk-060f8f-2026-01-28T10:05:18Z

[View official notice ](https://www.find-tender.service.gov.uk/Notice/ocds-h6vhtk-060f8f-2026-01-28T10:05:18Z)

 Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free ](/register)

[Buyer profileUnited Kingdom Industrial Fusion Solutions: past awards and live tenders](https://tendernation.io/buyers/united-kingdom-industrial-fusion-solutions)[SectorMore Construction work tenders](https://tendernation.io/sectors/construction-work)

## More tenders like this

[Gwelliannau i / Improvement works to the ‘Materials Recovery Facility’ (MRF) Ystâd Ddiwydiannol Cibyn, Caernarfon, Gwynedd, LL55 2BD

Cyngor Gwynedd

55 days left

10 Dec 2026](https://tendernation.io/opportunities/01a145df-0f49-7002-8294-fee17b4b2429/gwelliannau-i-improvement-works-to-the-materials-recovery-facility-mrf-yst)[Internal refurbishment of office building, College of Policing Ryton

College of Policing Limited

21 days left

6 Nov 2026](https://tendernation.io/opportunities/01a14571-3264-70ac-b47e-53d4d47c39bd/internal-refurbishment-of-office-building-college-of-policing-ryton)[NDC0130-26 - Installation of Replacement LED Lighting - Greenlanes

North Devon District Council

28 days left

13 Nov 2026](https://tendernation.io/opportunities/01a14571-3605-73e4-a82d-39df6bb2e4f2/ndc0130-26-installation-of-replacement-led-lighting-greenlanes)[CA18576 - Electrical Maintenance. 4 Year Opportunity

New College Swindon

34 days left

19 Nov 2026](https://tendernation.io/opportunities/01a1458c-9ef1-72d0-83ac-b95edf2163c7/ca18576-electrical-maintenance-4-year-opportunity)[Electrical Maintenance. 4 Year Opportunity

New College Swindon

34 days left

19 Nov 2026](https://tendernation.io/opportunities/01a14571-3744-7068-975c-bbafa5217467/electrical-maintenance-4-year-opportunity)[Rooftop Solar PV O&amp;M Framework 2027

West Sussex County Council

28 days left

13 Nov 2026](https://tendernation.io/opportunities/01a1451e-c38a-70c2-b40d-bef4d791169f/rooftop-solar-pv-om-framework-2027)
