# Large Scale Non-Battery based Electrical Energy Storage Systems

[United Kingdom Industrial Fusion Solutions](https://tendernation.io/buyers/united-kingdom-industrial-fusion-solutions)

Estimated value

Not stated

Published

27 Jan 2026

Deadline

Rolling deadline

## Who can bid

- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

## About this tender

The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification.

STEP is currently in its Concept Design phase, which is expected to be completed by 2026.

The electrical infrastructure of STEP will resemble that of large conventional thermal power stations; however, its design presents unique challenges:

Fusion power stations like STEP have exceptionally large parasitic (auxiliary/house) loads required to initiate and sustain fusion reactions-significantly higher than those in conventional power plants.

These parasitic loads must be supplied by external sources during plant start-up, before the power generation cycle begins producing electricity.

The highly dynamic nature of these loads could make compliance with grid code requirements challenging.

For more information, please refer to: Staying positive: producing net power \| Philosophical Transactions of the Royal Society A \| The Royal Society

UKIFS is seeking experts to support the technology selection of a Central Energy Storage System (CESS) that is part of the STEP Electrical infrastructure. Due to the power dynamics of operating the STEP power plant and the operating parameters set by the National Energy System Operator (NESO), an energy storage system is required to provide a mechanism to ensure that we remain within the NESO operating parameters.

Rather than a continuous output, STEP will operate on a pulsed basis. The power dynamics of the fusion pulses are typically different to a conventional power plant. The CESS has been identified as a critical system to the design as it provides a mechanism to compensate for the changing load dynamics throughout the pulse. This will ensure STEP remains within the NESO defined operating parameters at the point of grid connection.

The scope of the CESS cannot be fully defined due to knowledge gaps in CESS behaviour and limitations. Once these are understood, a technology will be selected, and limitations will be incorporated into the electrical infrastructure design. This PME is looking to address the knowledge gaps.

The proposed technical and operations of the CESS are

•2 operational cycles per day

•Pulse length will be over 1 hour (continuous)

•Power range larger than 300MW

•Energy capacity 100-300MWh

•Response in the millisecond range

•Similar charge and discharge rates.

•Fast response time during power swings (full charge to discharge)

•High round trip efficiency: 80%

In conjunction the CESS will be required to be operated and maintained for the 20-year life of the STEP machine.

Due to the requirements, we are attempting to ascertain if this could be accomplished or partly accomplished by a non-battery-based system (Flywheel, Super-conducting magnetic storage (SMES), Capacitor, Super Capacitor, Fuel Cells or other)

For more information about this opportunity, please visit the Delta eSourcing portal at:

[delta-esourcing.com](https://www.delta-esourcing.com/tenders/UK-UK-Culham:-Engineering-design-services./W8UFJUNW28)

To respond to this opportunity, please click here:

[delta-esourcing.com/respond/W8UFJUNW28](https://www.delta-esourcing.com/respond/W8UFJUNW28)

Read full description

## CPV classification

Engineering design services Electrical power systems design services Plant engineering design services

Source

Find a Tender (UK) · Notice ocds-h6vhtk-060fbe-2026-01-27T14:05:10Z

[View official notice](https://www.find-tender.service.gov.uk/Notice/ocds-h6vhtk-060fbe-2026-01-27T14:05:10Z)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile United Kingdom Industrial Fusion Solutions: past awards and live tenders](https://tendernation.io/buyers/united-kingdom-industrial-fusion-solutions) [Sector More Architecture, engineering & surveying tenders](https://tendernation.io/sectors/architecture-engineering-surveying)

## More tenders like this

[Engineering design services for the construction of civil engineering works – Dokumentace pro povolení záměru stavby č. 9567 Radlická radiála JZM - Smíchov; v úseku MÚK Bucharova – MÚK Jinonice · Hlavní Město Praha · 15 days left · 3 Nov 2026](https://tendernation.io/opportunities/01a15183-0c15-72b2-bb19-c3ab1550e67e/czechia-engineering-design-services-for-the-construction-of-civil-engineering) [Infrastructure works consultancy services – Contrôle extérieur des chaussées · Collectivité européenne d Alsace · 29 days left · 17 Nov 2026](https://tendernation.io/opportunities/01a15183-1730-733b-8247-a32bbbe2211c/france-infrastructure-works-consultancy-services-controle-exterieur-des-chau) [Architectural, construction, engineering and inspection services – Single Party Framework Agreement for Architect Led Integrated Design Team Services for Fire Safety Remediation Works for Dublin City Council · Dublin City Council · 5 days left · 23 Oct 2026](https://tendernation.io/opportunities/01a15183-0a15-7156-849b-5a223dd6d615/ireland-architectural-construction-engineering-and-inspection-services-sin) [Architectural, construction, engineering and inspection services – Būvprojekta izstrāde un autoruzraudzība fasādes siltināšanai kārtās Dzirciema ielā 16, Rīgā – 1.kārta, C korpuss · Rīgas Stradiņa universitāte · 28 days left · 16 Nov 2026](https://tendernation.io/opportunities/01a15183-3915-73d1-83e6-c378f9f7a926/latvia-architectural-construction-engineering-and-inspection-services-buvp) [Technical assistance services – Suivi et gestion de chantiers de réhabilitation de sites pollués · SPAQuE · 15 days left · 3 Nov 2026](https://tendernation.io/opportunities/01a15183-155e-73c2-a593-9e17375422ac/belgium-technical-assistance-services-suivi-et-gestion-de-chantiers-de-rehab) [Engineering design services – Planung GDRMA-HR Mittelhausen, Erfurt · SWE Netz GmbH · 29 days left · 16 Nov 2026](https://tendernation.io/opportunities/01a15183-1b45-71e4-84d1-8ef96006e2cb/germany-engineering-design-services-planung-gdrma-hr-mittelhausen-erfurt)