Source: https://tendernation.io/opportunities/01a13bcb-c6ff-70a3-9cbd-e193d374101f/london-construction-programme-general-works-framework-mw25-gw

awarded GB open procedure

# London Construction Programme General Works Framework MW25-GW

[London Borough of Haringey](https://tendernation.io/buyers/london-borough-of-haringey)

Estimated value

£3,000,000,000

Published

8 Jul 2026

Deadline

Closed

21 Apr 2025

## Who can bid

- Split into 16 lots

    You can usually bid for just the lots you can deliver.
- Sets up a framework

    Winning a place does not guarantee work: contracts are awarded later as call-offs, and the list usually stays closed for years.
- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

## About this tender

The London Construction Programme (LCP) on behalf of Haringey Council is procuring a new general works framework. The scope of works will include a wide range of works across multiple types of buildings including individual, multiple occupancy, residential, commercial, heritage, community and those operated by the public sector on a 24 hour basis (i.e. police, health, fire and rescue, care homes etc.). The scope of the works will include (but not limited to), new buildings, MMC, planned and preventative maintenance, refurbishment, retrofit, fire safety works, heritage related works, remediations, mechanical and engineering services, renewable energy systems and adaptations.

The Framework will be established for a period of 5 years and will be available to any public sector body in London and the Home Counties. It is anticipated the framework will commence in September 2025.

The London Construction Programme was established in 2012 by Haringey Council was, encouraged and supported by other London Local Authorities through London Councils, to develop a pan-London strategy to improve construction related procurement and establish a suite of collaborative contractual vehicles which public sector organisations can utilise. The LCP currently has a total membership of over 60 Public Sector organisations in London and Home County. The LCP is a 'virtual organisation' currently hosted and operated by Haringey Council.

The current LCP Framework (MW19) expired in October 2024. This new Framework is to provide General Works construction and General Works construction related activities for new build developments, building related planned component replacement, fire safety, remediations, retrofit and refurbishments according to the Lot Categories.

The services will be procured in 16 lots:

Lot GN1 New Build up to £7.5m contract value

Lot GN2 New Build £6m - £15m contract value

### Lot GN3 New Build £14m+ contract value

Lot GNPS New Build £1+ (i.e.no minimum contract value)

Lot GF1 Fire Safety Works up to £7.5m contract value

Lot GF2 Fire Safety Works £6m - £15m contract value

### Lot GF3 Fire Safety Works £14m+ contract value

Lot GFPS Fire Safety Works £1+ (i.e.no minimum contract value)

Lot GR1 Refurbishment and Retrofit up to £7.5m contract value

Lot GR2 Refurbishment and Retrofit £6m - £15m contract value

### Lot GR3 Refurbishment and Retrofit £14m+ contract value

Lot GRPS Refurbishment and Retrofit £1+ (i.e.no minimum contract value)

Lot GP1 Planned Preventative Maintenance up to £7.5m contract value

Lot GP2 Planned Preventative Maintenance £6m - £15m contract value

Lot GP3 Planned Preventative Maintenance £14m+ contract value

Lot GPPS Planned Preventative Maintenance £1+ (i.e.no minimum contract value)

Tenderers are restricted to applying for a maximum of two sub lots, plus the PS sub lot in each of the primary Lots (i.e. New Build, Fire Safety Works, refurbishment and retrofit, Planned Preventative Maintenance).

There are reserved places for micro and small enterprises on different Lots in order to encourage SMEs and provide choice for its Clients.

A Reserve List will also be used for this framework for those Tenderers who are unsuccessful in being awarded a place on the primary Lots.

The framework will be established with four main objectives in mind:-

- To support its Clients to deliver on their net zero commitments in the following areas:-
- Biodiversity assets
- Climate Change adaptation
- Zero Carbon Supply Chain
- Low Carbon Transportation
- Operational Low Carbon
- To provide a fast and efficient route to market for education schemes across London and the Home Counties that offers value for money.
- To drive positive changes in mental health and equality, diversity and inclusion in the construction sector.
- To apply best practice, unlock innovation and work collaboratively with its Client and the Supply Chain.

Read full description

## CPV classification

Construction work

Source

Find a Tender (UK) · Notice ocds-h6vhtk-04e6d8-2026-07-08T09:49:04+01:00

[View official notice](https://www.find-tender.service.gov.uk/Notice/ocds-h6vhtk-04e6d8-2026-07-08T09:49:04+01:00)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile London Borough of Haringey: past awards and live tenders](https://tendernation.io/buyers/london-borough-of-haringey) [Sector More Construction work tenders](https://tendernation.io/sectors/construction-work)

## More tenders like this

[Demolition work – Baumeister - Sanierung der ehem. Bleikristallfabrik Beyer & Co. · Gemeinde Altenstadt/WN · 3 days left · 21 Oct 2026](https://tendernation.io/opportunities/01a15183-d024-7097-85da-e978a119d95d/germany-demolition-work-baumeister-sanierung-der-ehem-bleikristallfabrik) [Motorway construction works – A02 Süd Autobahn, INSB V03 - V04.2, AB-Km 339,70 - AB-Km 342,58 - Instandsetzung Straße und Brücke · Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft · 4 days left · 22 Oct 2026](https://tendernation.io/opportunities/01a15183-585a-70dc-aba4-2c3f03da9015/austria-motorway-construction-works-a02-sud-autobahn-insb-v03-v042-ab-k) [Firefighting equipment installation work – Schaumlöschanlage (VE067), CVK, DHZC · Charité - Universitätsmedizin Berlin · 3 days left · 21 Oct 2026](https://tendernation.io/opportunities/01a15183-b929-71a2-940b-7b81046361a8/germany-firefighting-equipment-installation-work-schaumloschanlage-ve067) [Metalworking – SFA REKiZ - Metallbau Außentüren · St. Franziskus-Hospital Ahlen GmbH · 3 days left · 21 Oct 2026](https://tendernation.io/opportunities/01a15183-2dfb-7368-8071-ee198ab4b3d3/germany-metalworking-sfa-rekiz-metallbau-aussenturen) [Underground work other than tunnels, shafts and subways – Neubau Psychotraumazentrum Tiefbauarbeiten - Herstellung Baugrube und vorbereitende Tiefbauarbeiten - BWK Berlin · Staatl. Hochbauamt Ulm · 3 days left · 21 Oct 2026](https://tendernation.io/opportunities/01a15183-bfe8-7230-9405-2a95f84ab885/germany-underground-work-other-than-tunnels-shafts-and-subways-neubau-psych) [Works for complete or part construction and civil engineering work – CCS moodulhoonete ehitustööd (Tapa)-Narva lõigul · AS Eesti Raudtee · 4 days left · 22 Oct 2026](https://tendernation.io/opportunities/01a15183-449b-73b6-aaa3-ac70c7c2bce5/estonia-works-for-complete-or-part-construction-and-civil-engineering-work-c)
