Source: https://tendernation.io/opportunities/01a13bb7-8eab-7023-b8a9-69f22efa2610/william-blake-windows-and-redecorations-design-team

awarded GB open procedure Suitable for SMEs

# William Blake Windows and Redecorations – Design Team

[The Mayor and Commonalty and Citizens of the City of London](https://tendernation.io/buyers/the-mayor-and-commonalty-and-citizens-of-the-city-of-london)

Estimated value

£200,000

Published

24 Oct 2025

Deadline

Closed

30 Apr 2025

## Who can bid

- Buyer says suitable for SMEs

    The buyer ticked “suitable for SMEs” on the notice. Anyone can still bid.
- Buyer says suitable for VCSEs

    The buyer ticked “suitable for voluntary, community and social enterprises” on the notice.
- Open procedure

    Anyone can submit a full tender; there is no shortlisting stage.

[More contracts for small businesses and VCSEs](https://tendernation.io/opportunities/for-small-businesses)

## About this tender

The City of London Corporation wished to procure a multi-disciplinary design team to undertake principal designer duties, deliver the pre-planning and full planning applications, produce specifications and cost plans ready to tender for the works, and undertake contract administration duties for the Window Replacement and Associated Works project at William Blake Estate.

The successful consultant was to survey the existing windows and external doors (where located within window sets) to determine how the existing windows were to be removed and replaced with new, efficient contemporary windows which would achieve Listed Building Consent. In conjunction with the window replacements, particular consideration was essential to ensure that adequate ventilation was incorporated within the design proposals.

Each block had its own set of windows in various fenestrations, which consisted mainly of timber-framed single-glazed sliding sash windows. The consultant was expected to review previously approved planning applications and undertake any additional surveys for each block and window type before submitting new pre-planning applications (including a summary of options) and then subsequently using the advice to submit the full planning application.

During the planning process, the consultant was expected to review previous planning submissions and responses and build the new specifications ready to tender either via a compliant open tender process or via a nominated framework. Subject to full planning permissions, the consultant would submit a specification to accompany City of London tender documents.

The requirements for the new windows were to protect the building from external conditions, provide privacy and security, improve the acoustic performance, provide thermal insulation, aid in the external fabric’s resistance to the spread of fire, provide access to daylight, provide controllable ventilation, resist wind loadings, and provide protection from falling and impact.

The Corporation also intended to incorporate various associated works into this window replacement package, in order to maximise efficiencies and ensure that its landlord responsibilities were fully met. Although the window replacement element was undoubtedly a key component of the works, a holistic approach was considered most appropriate at that stage, in respect of the blocks’ external envelope.

Read full description

## CPV classification

Architectural services for buildings

Source

Find a Tender (UK) · Notice ocds-h6vhtk-04fcdd-2025-10-24T11:34:05+01:00

[View official notice](https://www.find-tender.service.gov.uk/Notice/ocds-h6vhtk-04fcdd-2025-10-24T11:34:05+01:00)

Never miss a tender like this again

Get AI summaries, deadline alerts and a bid pipeline for tenders matched to your business. Free to start.

[Track tenders free](https://tendernation.io/register)

[Buyer profile The Mayor and Commonalty and Citizens of the City of London: past awards and live tenders](https://tendernation.io/buyers/the-mayor-and-commonalty-and-citizens-of-the-city-of-london) [Sector More Architecture, engineering & surveying tenders](https://tendernation.io/sectors/architecture-engineering-surveying)

## More tenders like this

[Asbestos Management Framework · Home Group · 25 days left · 13 Nov 2026](https://tendernation.io/opportunities/01a15476-5fff-736e-ae2e-0c8a400c7297/asbestos-management-framework) [Infrastructure works consultancy services – Contrôle extérieur des chaussées · Collectivité européenne d Alsace · 29 days left · 17 Nov 2026](https://tendernation.io/opportunities/01a15183-1730-733b-8247-a32bbbe2211c/france-infrastructure-works-consultancy-services-controle-exterieur-des-chau) [Architectural, construction, engineering and inspection services – Single Party Framework Agreement for Architect Led Integrated Design Team Services for Fire Safety Remediation Works for Dublin City Council · Dublin City Council · 5 days left · 23 Oct 2026](https://tendernation.io/opportunities/01a15183-0a15-7156-849b-5a223dd6d615/ireland-architectural-construction-engineering-and-inspection-services-sin) [Architectural, construction, engineering and inspection services – Būvprojekta izstrāde un autoruzraudzība fasādes siltināšanai kārtās Dzirciema ielā 16, Rīgā – 1.kārta, C korpuss · Rīgas Stradiņa universitāte · 28 days left · 16 Nov 2026](https://tendernation.io/opportunities/01a15183-3915-73d1-83e6-c378f9f7a926/latvia-architectural-construction-engineering-and-inspection-services-buvp) [Technical assistance services – Suivi et gestion de chantiers de réhabilitation de sites pollués · SPAQuE · 15 days left · 3 Nov 2026](https://tendernation.io/opportunities/01a15183-155e-73c2-a593-9e17375422ac/belgium-technical-assistance-services-suivi-et-gestion-de-chantiers-de-rehab) [Engineering design services for the construction of civil engineering works – Dokumentace pro povolení záměru stavby č. 9567 Radlická radiála JZM - Smíchov; v úseku MÚK Bucharova – MÚK Jinonice · Hlavní Město Praha · 15 days left · 3 Nov 2026](https://tendernation.io/opportunities/01a15183-0c15-72b2-bb19-c3ab1550e67e/czechia-engineering-design-services-for-the-construction-of-civil-engineering)
